1. Undisturbed samples are to be taken for the following test: a- Specific gravity b- Sieve analysis c- Consolidation d- Plasticity indices II. To avoid the disturbance of sensitive soft soil, the area ratio should be: a- 14% b- ≤ 10% c- ≥ 10% d- 20% III. Open test pit is suitable up to a depth of: a- 5 m b- 6 m c- 2 m d- 3m IV. Shellby tube is of the most widely used device for: a- Drilling rock and cobbles b- Measuring effective stress c- Wash boring d- Collecting undisturbed soil samples V. If you have a 4-story heavy concrete building, the depth of boring estimated to be: a- = 16 m b- 12 m c- 8 m d- 20 m

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Please solve all points
1. Undisturbed samples are to be taken for the following test:
a- Specific gravity
b- Sieve analysis
c- Consolidation
d- Plasticity indices
II. To avoid the disturbance of sensitive soft soil, the area ratio should be:
a- 14%
b- ≤ 10%
c- ≥ 10%
d- 20%
III. Open test pit is suitable up to a depth of:
a- 5 m
b- 6 m
c- 2 m
d- 3m
IV. Shellby tube is of the most widely used device for:
a- Drilling rock and cobbles
b- Measuring effective stress
c- Wash boring
d- Collecting undisturbed soil samples
V. If you have a 4-story heavy concrete building, the depth of boring estimated to be:
a-
16 m
b- 12 m
c- 8 m
d- 20 m
Transcribed Image Text:1. Undisturbed samples are to be taken for the following test: a- Specific gravity b- Sieve analysis c- Consolidation d- Plasticity indices II. To avoid the disturbance of sensitive soft soil, the area ratio should be: a- 14% b- ≤ 10% c- ≥ 10% d- 20% III. Open test pit is suitable up to a depth of: a- 5 m b- 6 m c- 2 m d- 3m IV. Shellby tube is of the most widely used device for: a- Drilling rock and cobbles b- Measuring effective stress c- Wash boring d- Collecting undisturbed soil samples V. If you have a 4-story heavy concrete building, the depth of boring estimated to be: a- 16 m b- 12 m c- 8 m d- 20 m
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 7 steps with 3 images

Blurred answer
Knowledge Booster
Soil compaction test
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning