15-12. Complete the following MRP matrix for item A: Item: A LLC: 1 Period Lot Size: Mult 50 LT: 2 1 2 3 4 5 67 8 10 15 25 75 60 85 45 60 Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts 50 Planned Order Releases
Q: Draw a product structure diagram from the following billof materials and calculate how many D's are…
A:
Q: Briefly discuss what are the various type objectives of Material Requirements Planning (MRP )?
A: MRP's fundamental objective is to provide an adequate supply of dependent demand inventory when it…
Q: What do you understand by Materials requirements planning (MRP)?
A: Production is the process of transforming the raw materials and resources into finished products and…
Q: The gross requirements and bills of material for parent X are given below. Complete the MRP records…
A: Projected Available Balance = Projected Available for last period + Schedule Receipt + Planned Order…
Q: 17 To minimize the effects of uncertainty due to lead times, MRP systems incorporate ______. a…
A: Note: - Since the exact question to be answered is not specified we will answer only the first…
Q: 2. Use the following MPS, BOM, and inventory record to answer the MRP questions. a) Master…
A: The production schedule used to draft the plan for the final item is known as the master production…
Q: A factory has just received an order for 95 units of an end item, which are to be shipped at the…
A: Planned Order Release of Component D = 762 Formula Used : Projected available Balance =…
Q: Pennington Cabinets is a manufacturer of several different lines of kitchen and bathroom cabinets…
A: Find the Given details below: Month Jan Feb Mar Gross Requirements 1100 1150 Scheduled…
Q: Given the following information, develop a material requirements plan for end item A and its…
A:
Q: The following table lists the components needed to assemble an end item, lead times (in weeks), and…
A: A time based production chart and Product structure chart are helps to identify the correct…
Q: What is MRP (Materials Requirement Planning) I and why is it important?
A: MRP supports production companies to measure and optimize their material demands.it is the most…
Q: L4L lol-sizng rule, develop a Material Requirements Plan (MRP) Jor the n 8 weeks for A151 part.…
A: MRP stands for material requirements planning, and it is a technique for determining the materials…
Q: (a) Construct a product structure and a gross material requirements plan for the dependent inventory…
A: A Small Introduction About Inventory Inventory management software keeps track of item levels and…
Q: Use diff erent lot size rules with MRP
A: The process through which the raw materials are processed and transformed into a finished product is…
Q: Explain the requirement for effective MRP
A: Material requirement planning is a technique used to identify how much material is required for a…
Q: Figure 11.38 shows a partially completed inventory recordfor the real wheel subassembly. Gross…
A: FOQ or Fixed Order Quantity is the stock that is ordered when the stock hits the point of re-order,…
Q: As an approach to inventory management, how does MRP differ from the approach taken, dealing…
A: Production is the process of manufacturing the finished products for the customers using raw…
Q: Use the following partially completed MRP record to answer the question. Item: XYZ Lot Size:…
A: The formulas that we use are Planned order receipt 2 = (Gross requirement 2 - Projected on hand 2 -…
Q: The bill of materials and the data from the inventory recordsfor product A are shown in Figure…
A: As per the given BOM and inventory report, there will be slight issues with D as the Product has a…
Q: Determine the MRP record for D using: a) POQ (P=2) b) EOQ Lot sizing method c) Part-period balancing…
A: Small Introduction about MRP Fabric prerequisites arranging (MRP) may be a computer-based stock…
Q: example of cafe's Material Requirement Planning (MRP
A: Material requirements planning (MRP is an arranging and control framework for stock, creation, and…
Q: 4. The partially completed MPS for a product is given below. Item: Ball bearings Order Policy: 500…
A: Concept- A master production schedule (MPS) is a system for having individual goods delivered at a…
Q: made of 2 units of T & 4 units of U. LT are 1 week except for level 125 units. Show the product…
A: Part a)
Q: Develop a material requirements plan for component H. Lead times for the end item and each component…
A: Structure Lead time Quantity on hand A 1 B(2) 3 15 C 1 B D(4) 1 E(2) 1 130…
Q: The MRP gross requirements for Item A are shown here for the next 10 weeks. Lead timefor A is three…
A: Lead Time = 3 weeks Setup Cost = $10 Carrying Cost = $0.01 per unit Beginning Inventory = 90 units…
Q: Explain the approach of MRP while dealing with the inventory management ?
A: MRP stands for material requirement planning and it is a manufacturing management system that helps…
Q: How is safety stock included in a material requirements plan?
A: Safety stock is the additional quantity of products held by the organization as stock to reduce the…
Q: Briefly discuss what are the various types of objectives of Material Requirements Planning (MRP )?
A: MRP (Material Requirement Planning) is the inventory management technique in which the planning of…
Q: The following table lists the components needed to assemble an end item, lead times (in weeks), and…
A: Based on the given table, we prepare a product tree structure as shown below: Answer: 392
Q: You have just been notified that the lead time forcomponent G of product A ( You are product pla…
A: Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: Once a material requirements plan (MRP) has been estab-lished, what other managerial applications…
A: After formulating a material requirements plan, various other decisions are to be made by the…
Q: Given the following MRP matrix for Item D, the planned order receipt for period 4 is ITEM: D Рeriod…
A: An MRP table is a computer based technique which helps for schedule the production and manage the…
Q: Consider the bill of material for product P and the data given in the following table. The master…
A: A master production plan helps to identify the required units of demand based on the parent material…
Q: Given the following MRP matrix for Item D, the planned order receipt for period 4 is ITEM: D Period…
A: An MRP table helps to plan the ordering process and manage the receiving process of materials. The…
Q: A company manufactures two wheeler passengers’ helmets. The initial stock on hand is 5000 units. The…
A:
Q: In the following MRP planning schedule for Item J, indicate the correct net requirements,…
A: Projected available balance = projected available balance of previous week + scheduled receipts if…
Q: Given the following production schedule, compute the available-to-promise quantities. Week 3 4 MPS…
A: Available to promise or ATP is the predicted volume of inventory a company has in stock, ready to…
Q: Refer to the bill of materials for product A shown in Figure 11.23. If there is no existing…
A: Solution Here, following are the quantity of each item required for production of one unit of…
Q: Should BestLine’s ordering department have been more involved during the project? 2. Sarah used…
A: "Since you have asked multiple questions, we will answer the first one for you. To get the remaining…
Q: 1. Speedy, Inc. is a company that produces automotive electrical components. AISI is a common part…
A: Answer: Calculation and formula are shown below:
Q: Questions: a. Develop and complete the material requirement planning to plan the production of the…
A: given,
Q: Develop a material requirements plan for component H. Lead times for the end item and each component…
A:
Q: a) Develop the time-phased product structure. b) Produce the MRP for fulfilling the order.
A: The following steps have time phased structure and MRP for fulfilling the order
Q: Once a material requirements plan (MRP) has been established, what other managerial applications…
A: Material requirements planning often called MRP can be stated as the framework or system for…
Q: 2. Given the information below, complete the MRP record and explain what it tells the inventory…
A: Given data is
Q: In the following MRP planning schedule for Item J, indicate the correct net requirements, planned…
A: Given data is Lead time = 1 week
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Product A Order Qty = 400 Order Lead Time = 2 Forecast Demand Scheduled Receipts Projected Available Inventory 400 Planned Order Receipts Planned Order Releases 1 300 OD 4, 6, 2 300 400 Sketch and fill in the grid on scrap paper to use on upcoming questions In what periods would you incur a planned order release? OA 1.3, and 4 2.4, and 5 OC 3,5, and 6 and 7 3 300 PERIODS 4 300 5 300 6 300 7 100 8 100Consider the following information. PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 100 Q = 60, LT= 3 weeks, Safety Stock = 5 1 70 70 PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 100 Planned Order Releases 1 70 70 100 2 0 > X WEEK 3 40 Compute the planned order releases and projected on-hand inventory for component part X. Round your answers to the nearest whole number. If your answer is zero, enter "0". 2 0 4 0 100 WEEK 3 40 5 160 60 4 0 40 0 X 5 160 Check My Work -60 0Consider the following information. PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 130 Q-60, LT-3 weeks, Safety Stock - 20 Compute the planned order releases and projected on-hand inventory for component part X. Round your answers to the nearest whole number. If your answer is zero, enter "0". PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 130 Planned Order Releases 1 50 50 1 50 130 0 2 0 WEEK 3 70 99 2 0 130 120 ®® 4 0 WEEK 3 70 30 0 5 130 x 4 0 30 5 130 20 0
- Q6) Tracking signals track changes in control limits can lead to an increase in cumulative errors can capture changes in trends track changes in demand updates none of the above Q7) In an inventory problem, the fixed ordering costs are increased but all other factors remain the same. This change will increase the optimum order quantity change the demand pattern reduce the optimum order quantity change the stockout costs increase the optimum lead time Q8) In an MRP system, the lead time to acquire or produce components is used in calculating net requirement from gross requirements net requirements from available planned order releases from planned order receipts lot sizes for scheduled orders none of the above|Product D is stocked only at the AMC Chemical Company's Dallas warehouse and at the company's plant warehouse in Akron. The sales director has forecast product sales from the Dallas warehouse to be 40 units per week for the next 8 weeks. Product D is manufactured at the firm's Akron plant using 2 units of ingredient X per unit of product D. Information: Ingredient X Projected available balance: 4 Units Schedule receipt in week 1: 320 units Safety stock quantity: 2 Product D in Dallas Product D in Plant Warehouse Warehouse Projected available balance: 85 Units Safety stock quantity: 5 units Lead time: 2 weeks Lot for lot size quantity Projected available balance: 2 Units Schedule receipt in week 1: 46 units Safety stock quantity: 8 units units Lead time: 1 week Lead time: 4 weeks Lot for lot size quantity Lot size quantity: 320 units Prepare the DRP records for product D at the Dallas warehouse and the plant warehouse as well as the MRP record for ingredient X (Assume ingredient X is…K The demand for subassembly S is 130 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each unit of T requires 2 units of V, 1 unit of W, and 1 unit of X. Finally, each unit of U requires 1 unit of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 week to make X, 2 weeks to make Y, and 1 week to make Z. Click the icon to view the product structure and the time-phased product structure. Click the icon to view the on-hand inventory. Suppose that in addition to 130 units of S, there is also a demand for 20 units of U, which is a component of S. The 20 units of U are needed for maintenance purposes. These units are needed in week 6. Additionally, a new order has been received for 80 units of S due in week 8. Modify the net material requirements plan to reflect these changes. Construct a new net material requirements plan (enter your responses as whole numbers).…
- 2-Using the worksheet, what is the cost for a EOQ MRP strategy? Note: round your EOQ calculation to the nearest whole number (no fractions of units) Answer format is XXXX without the $ symbol or a comma separator. Setup Cost = $350/order; Inventory Holding Cost = $2.50 per part per week; Leadtime = 1 week 2. EOQ - Week 1 2 3 4 5 6 7 8 9 10 11 12 13 Gross Requirements 65 50 90 85 90 60 50 50 80 85 80 65 50 Scheduled Receipts Projected OH = 50 Net Requirements Planned Order Receipts Planned Order Releases8Q1) Bullwhip effect can lead to stock shortages due to lack of proper information. Select one: a. True b. False Q2) The ability to track the location of the order is known as supplier visibility. Select one: a. False b. TrueOne unit of A is composed of two units of B and three units of C. Each B is composed of one unit of F. C is made of one unit of D, one unit of E, and two units of F. Items A, B, C, and D have 28, 40, 36, and 25 units of on-hand inventory. Items A, B, and C use lot-for-lot (L4L) as their lot-sizing technique, while D, E, and F require multiples of 62, 110, and 90, respectively, to be purchased. B has scheduled receipts of 15 units in Period 1. No other scheduled receipts exist. Lead times are one period for Items A, B, and D, and two periods for Items C, E, and F. Gross requirements for A are 15 units in Period 1, 12 units in Period 2, 50 units in Period 6, and 50 units in Period 8. Find the planned order releases for all items. (Leave no cells blank - be certain to enter "O" wherever required.) Period 3 4 6 7 8 Gross requirements Item A Scheduled receipts OH = 28 Projected available balance Net requirements Planned order receipts Planned order releases LT = 1 SS = 0 Q = L4L Gross…
- (a) Give examples of independent and related dependent demand (b) APL company assembles and sales an electronics device (ED) on a contract basis. End item ED has composed of 3 units of subassembly BG and 5 units of component DD. BG is assembled using 3 DDs and 4 FCs. There are orders of 500 and 875 units of the device (ED) at the beginning of week 6 and week 8. In assembling BG, an extra 20 percent scrap allowance must be added. DD can only be ordered in whole cases of 400 units per case. One case of DD is received in each of week 1 and week 2. Also, there are 200 units of BG and 425 units of DD now on hand. The lead time for the item BG, DD, and FC is 2 weeks and that is for the item ED is 1 week.i. Calculate the required number of DD and FC for producing 100 units of ED. There is no stock of any item. ii. Prepare a material requirements plan for the component DD.3. Prepare an MRP. Mowmaster is Lawn King's most popular model. Like all push mowers, it is made of a motor assembly (purchased from a vendor), handle assembly, and body assembly. The handle assembly is made of a handle and shifter. The body assembly consists of a blade, frame, and 4 wheels. a. Complete the product structure tree for the Mowmaster. b. Complete a net MRP for wheels if 2000 Mowmasters need to be shipped in week 8. Reminder to use Q from part 2 as the lot size for the mower. Item Mowmaster Motor assembly Handle assembly Body assembly Handle Shifter Blade Frame Wheels Lead Time Inventory 100 10 1 2 1 2 1 2 1 1 2 10 300 0 0 0 0 1550 Lot size Q= Lot for lot Lot for lot Lot for lot Lot for lot Lot for lot Lot for lot Lot for lot 200Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level 0 kits. Complete the MRP records, using the following information: • Production plans for complete kits are as follows: Start assembling 4,500 kits in week 2 Start assembling 1,000 kits in weeks 3, 4, and 5 Start assembling 8,000 kits in week 6 • The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements. • All scheduled receipts, lead times, and beginning inventory levels are shown. Click the icon to view the MRP records. Construct the material requirements plan for item System unit (enter your responses as whole numbers). System unit: Lead Time = 1 week; Minimum order quantity = 3,500 Week 1 2 3 Gross requirements 4,500 1,000…