A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA; St. Luis, MO). The supplier can ship every day, every other day, or every third day. There is a penalty of $0.30/cwt for each day delayed. Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty costs due to the delay. Shipment Transportation Rate (S/cwt) City Weight/day LTL< TL > 50,000 lb 50000 lb Chicago, IL 18,000 lb (180 cwt) 1.50 1.25 Athens, GA 15,000 lb (150 cwt) 1.35 1.00 St. Luis, MO 12,000 lb (120 cwt) 2.00 1.50 Total 45,000 lb = 450 cwt Find what is the cost for the following: Shipping Every Day Shipping on the alternate Day (every two days) Shipping every three Day
Q: Dell computers and Subway sandwiches are examples of. Select one: a. Job shop b. Standard Option…
A: Production management is the aspect that deals with all the activities and functions of the…
Q: Grainger: Reengineering the China/ W. W. Grainger, Inc., is a leading supplier of maintenance,…
A: Variable costs for processing at the port are $5.00 per cubic meter (CBM) in both Los Angeles and…
Q: When working well, the issue management process. Automatically operates with little to no company…
A: Correct option is (c)continuously cycle back to the beginning and repeat.
Q: shipping process and make sure of the quality in their process. To monitor the process, for 10…
A: The problem is related to the statistical control charts. The p chart is the appropriate chart for…
Q: Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the…
A: Given Data:Setup labor cost Annual holding cost Daily production (8 hours) Annual demand for…
Q: Unlike community development and job training organizations, business attractions organizations…
A: The objective of the question is to understand the primary purpose of business attraction…
Q: The product manager of a tide and he is planning to launch a new product. He can either launch Tide…
A: Decisions AbbrevationsTide with ZonroxTZTide with DownyTZNo launchNL…
Q: Top management usually performs all of the following tasks EXCEPT: O a. establish long-range plans O…
A: Production management is the aspect that deals with all the activities and functions of the…
Q: Dell computers and Subway sandwiches are examples of. Select one: a. Job shop b. Standard Option…
A: Production management is the aspect that deals with all the activities and functions of the…
Q: The Tyco scandal of 2002 clearly demonstrates that the firm’s moral compass was askew. In the…
A: Interviewing important players in the Tyco affair would be my first step as an investigator in order…
Q: Solve the following LP problem: Min 12S + 5M s.t. 1) S+ M = 200,000 2) .10S + .05M =>14,000 3) M =>…
A: Linear programming helps us to find the optimal solution/best outcome, with the given…
Q: The table below shows the sales for a plastics manufacturer recorded over the past year. The…
A: Find the given details below:
Q: 4.17 Complete the following MRP record. The lead time is four weeks, and the lot size is 200. What…
A: To complete the MRP record and address the changes in gross requirements in week 3, we will update…
Q: ead the Analytics in Action, Procter & Gamble Uses Business Analytics to Redesign its supply chain…
A: Supply chain management is the aspect of management that deals with all the movement or flow that…
Q: In the table below, scores are based on 50=best Location Factor Weight A B C…
A: To determine which location should be selected, we calculate the total scores for each location…
Q: A. Find the tracking signal for each month. B. Does the model provide acceptable answers!
A: Step 1:To find the tracking signal for each month, we can use the following formula:Tracking Signal…
Q: Use the simplex method to solve the following LP model Minimize Z = 8X1 + 6X2 Subject to: 2X1 + 4X2…
A: Objective Function:Minimize Z = Subject to-
Q: wing mons Oa. The application of the concepts and methods of OM is limited to the technology…
A: Operations management (OM) is a critical capability inside associations that is liable for managing…
Q: None
A: WeekNumber of CampersCost to Run…
Q: Don't use chatgpt, I will 5 upvotes Alan wants to bake blueberry muffins and bran muffins for the…
A: Linear programming helps us to find the optimal solution/best outcome, with the given constraints.We…
Q: None
A: Six Sigma is a systematic approach to process improvement that focuses on minimizing variability and…
Q: Month Demand Forecast 1 40 2 50 3 42 4 55 5 41 50 6 42 7 Sum Mean Error Abs Error Bias MAD When…
A: Let me show the given data, MonthDemandForecast140250342455541506427Here, I will use the…
Q: Which is a Characteristic of a business process? Resources Performance measurement Business process…
A: In a business process, we can find a set of interconnected tasks, These tasks can be performed by an…
Q: In keeping with the best practices in project management, identify and delineate five(5) key…
A: 1. Collect Foundational Data: This step involves accumulating all pertinent current records about…
Q: Are there any key alliances that need to be considered from key suppliers/ competitors?
A: Business Expansion is about increasing the growth of business in the market it includes determining…
Q: What effect would the following scenario have on a company's net income? Worldwide Company imports…
A: When a company's inventory becomes obsolete, it often results in a write-down or write-off where the…
Q: An electrical utility needs to generate 6,300 megawatts of electricity today. It has five generators…
A: There are 5 generators which may be used to generate electricity. The details are given…
Q: What is the optimal objective function value for this problem? OA. $130 B. $240
A: Find the given details below:
Q: please do ii. and explain and breakdown workings.
A: Forecast for:Period 4= 44.2Period 5=47Period 6=48.2Period 7=52.4Period 8=48.6Period 9=49.8Period…
Q: True or False: The Six Sigma methodology in operations management primarily focuses on reducing…
A: Six Sigma methodology comprises a systematic way of achieving process improvement by gradually…
Q: Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the…
A: Find the given details below:
Q: UA Hamburger Hamlet (UAHH) places a daily order for its high-volume items (hamburger patties, buns,…
A: Find the given details below:
Q: How has the landscape of work changed? How will technology continue to change the way work is…
A: The Workplace Has Changed PermanentlyThe COVID-19 epidemic has had a major impact on the recent…
Q: Explain the concept of setup or ordering costs and its relevance to EOQ.
A: Setup or ordering cost discuss with the prices incurred on every occasion an order is located for…
Q: Operations, support, management
A: Business processes refer to a series of interconnected activities or tasks that are carried out…
Q: What could Zuckerberg have done during the problem-solving stage of negotiations with Instagram…
A: The objective of the question is to identify the best approach that Mark Zuckerberg could have taken…
Q: Just do parts B and C
A: Certainly! Let's break down the problem step by step: Process Capability Index (Cpk):The process…
Q: A manufacturing process in a certain production facility seems to have shifted from the center,…
A: Currently, 4% of the production of the products is measured below LTL, and 1% is measured above…
Q: 'Z' chart is a chart used in: (a) Programme control, (b) Job control, (c) Cost control, (d) Quality…
A: "Z" Chart : The "Z" chart, also known as the Z-score chart or the Z-chart, is a statistical…
Q: A bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for…
A: Find the given details below:
Q: Retailers Warehouse (RW) is an independent supplier of household items to department stores. RW…
A: To find the Economic Order Quantity (EOQ), we can use the formula:EOQ = √((2DS) / H)Where:D = Demand…
Q: A builder has located a piece of property that she would like to buy and eventually build on. The…
A: Find the given details below:
Q: Assume material A calls out material B. Material A has a stock quantity of 20. Materia A has a…
A: We are tasked with managing the inventory and production scheduling for two materials, referred to…
Q: Nonprofits have to pay attention to donor privacy because: A. Donors might not want their name…
A: The question is asking why nonprofits need to be mindful of donor privacy. The options provided are:…
Q: The Lifang Wu Corporation manufactures two mod- strial robots, the Alpha 1 and the Beta 2. The firm…
A: 5 technicians working 160 hours each per month
Q: Current challenges in operations management include all of the following EXCEPT: OA. sustainability.…
A: Sure, let's break down each option and why it may or may not be considered a challenge in operations…
Q: Although the problems say solve graphically, please solve all problems using the QM for Windows…
A: By applying graphical methods to solve the linear programming problem for the Christina Alvarez…
Q: Operations management is in all job descriptions.
A: The concept of operations management involves the design, execution, and control of business…
Q: Month Demand 1 45 2 48 3 43 4 48 5 49 6 54 7 47 8 50 9 46 10 47 Using the table above, calculate two…
A: (i) Exponentially smoothed forecasts were calculated using a smoothing constant of 0.4, yielding a…
Q: 5). A warehouse has an average inventory of 1000 units and a turnover rate of 10 times per year.…
A: Given Data:Average inventory Turnover rate
Step by step
Solved in 5 steps with 26 images
- Scenario 3 Ben Gibson, the purchasing manager at Coastal Products, was reviewing purchasing expenditures for packaging materials with Jeff Joyner. Ben was particularly disturbed about the amount spent on corrugated boxes purchased from Southeastern Corrugated. Ben said, I dont like the salesman from that company. He comes around here acting like he owns the place. He loves to tell us about his fancy car, house, and vacations. It seems to me he must be making too much money off of us! Jeff responded that he heard Southeastern Corrugated was going to ask for a price increase to cover the rising costs of raw material paper stock. Jeff further stated that Southeastern would probably ask for more than what was justified simply from rising paper stock costs. After the meeting, Ben decided he had heard enough. After all, he prided himself on being a results-oriented manager. There was no way he was going to allow that salesman to keep taking advantage of Coastal Products. Ben called Jeff and told him it was time to rebid the corrugated contract before Southeastern came in with a price increase request. Who did Jeff know that might be interested in the business? Jeff replied he had several companies in mind to include in the bidding process. These companies would surely come in at a lower price, partly because they used lower-grade boxes that would probably work well enough in Coastal Products process. Jeff also explained that these suppliers were not serious contenders for the business. Their purpose was to create competition with the bids. Ben told Jeff to make sure that Southeastern was well aware that these new suppliers were bidding on the contract. He also said to make sure the suppliers knew that price was going to be the determining factor in this quote, because he considered corrugated boxes to be a standard industry item. As the Marketing Manager for Southeastern Corrugated, what would you do upon receiving the request for quotation from Coastal Products?Scenario 3 Ben Gibson, the purchasing manager at Coastal Products, was reviewing purchasing expenditures for packaging materials with Jeff Joyner. Ben was particularly disturbed about the amount spent on corrugated boxes purchased from Southeastern Corrugated. Ben said, I dont like the salesman from that company. He comes around here acting like he owns the place. He loves to tell us about his fancy car, house, and vacations. It seems to me he must be making too much money off of us! Jeff responded that he heard Southeastern Corrugated was going to ask for a price increase to cover the rising costs of raw material paper stock. Jeff further stated that Southeastern would probably ask for more than what was justified simply from rising paper stock costs. After the meeting, Ben decided he had heard enough. After all, he prided himself on being a results-oriented manager. There was no way he was going to allow that salesman to keep taking advantage of Coastal Products. Ben called Jeff and told him it was time to rebid the corrugated contract before Southeastern came in with a price increase request. Who did Jeff know that might be interested in the business? Jeff replied he had several companies in mind to include in the bidding process. These companies would surely come in at a lower price, partly because they used lower-grade boxes that would probably work well enough in Coastal Products process. Jeff also explained that these suppliers were not serious contenders for the business. Their purpose was to create competition with the bids. Ben told Jeff to make sure that Southeastern was well aware that these new suppliers were bidding on the contract. He also said to make sure the suppliers knew that price was going to be the determining factor in this quote, because he considered corrugated boxes to be a standard industry item. Is Ben Gibson acting legally? Is he acting ethically? Why or why not?A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA; St. Luis, MO). The supplier can ship every day, every other day, or every third day. There is a penalty of $0.30/cwt for each day delayed. Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty costs due to the delay. Transportation Rate (S/cwt) Shipment City Weight/day LTL 50,000 lb 50000 lb Chicago, IL 18,000 lb (180 cwt) 1.50 1.25 Athens, GA 15,000 lb (150 cwt) 1.35 1.00 St. Luis, MO 12,000 lb (120 cwt) 2.00 1.50 Total 45,000 Ib = 450 cwt Find what is the cost for the following: Shipping Every Day Shipping on the alternate Day (every two days) Shipping every three Day
- A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA; St. Luis, MO). The supplier can ship every day, every other day, or every third day. There is a penalty of $0.30/cwt for each day delayed. Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty costs due to the delay. Transportation Rate (S/cwt) Shipment City Weight/day LTL 50,000 lb 50000 Ib Chicago, IL 18,000 lb (180 cwt) 1.50 1.25 Athens, GA 15,000 lb (150 cwt) 1.35 1.00 St. Luis, MO 12,000 lb (120 cwt) 2.00 1.50 Total 45,000 lb = 450 cwt !3! Find what is the cost for the following: Shipping Every Day Shipping on the alternate Day (every two days) Shipping every three DayAfter applying the NWC Rule for the initial tableau of the given transportation model, evaluate the vacant cells. What is the cell which has the most negative evaluation value and what is the cell evaluation value? DESTINATION SOURCE DEMAND X Y N OX-R; 1 OY-S; -1 OX-S; -1 OY-S; -2 P 75 8 12 EI 11 Q 80 5 8 11 R 120 7 10 10 S 50 11 13 14 SUPPLY 100 125 100 325JuicyJuicy Company is a dairy manufacturing company in Serdang, Malaysia. This company isthe supplier of dairy products to a number of hypermarkets in the Serdang area. It is critical thateach order be delivered (shipped) and arrive at a specified time to ensure the quality of theirproducts and a good relationship with the buyers. However, for the past two weeks the productscannot reach the location on time. Resulted to that, they are getting many complaints from thecustomers and considering to switch to other suppliers. Thus, the company must overcome theproblem as quickly as possible. (a) Recommend a suitable quality tool that could identify the problem and to monitor thebusiness performance. Please explain and justify your suggestion. (b) Develop the selected tool (answer in part (a)) to show how it can clarify all possiblecauses and solution to the issue.
- suppose you have an order of 600,000 pieces polo shirt.per box contain 40 pcs polo shirt,carton length: 50 cm, width: 30 cm, height: 30 cm, sea freight cost per CBM $45, shipment will be done in FCL basis.Calculate total required CBM and which container will be justifiable for shipmentUse the appropriate strategy to assign joint costs of an LTL route to each of the following shipments. Show your calculations and the assigned cost below. [1] A PUD truck driver works ten hours serving local customers for an LTL carrier. On the route, the driver makes 12 stops at area industries. The driver averaged 25 miles per hour while driving and drove 150 miles. During the trip, the driver handled 80 separate shipments, filling 70% of his truck by weight and 65% by the cube. The route cost a total of $2450. Using the time strategy for PUD cost assignment, determine the costs to be assigned to Shipper A and each shipment if the driver handled 4 shipments (3 delivered, 1 picked up) at the stop, and took 40 minutes to serve the Shipper. Total Assigned Cost for Shipper A Assigned Cost for Each Shipment [2] An LTL linehaul truck route takes 15 hours to complete. During the move, the truck moved an average of 36,500 pounds of freight, which filled 3200 cubic feet of the trailer. The…es Problem 11-4 (LO2) An appliance manufacturer has a plant near Toronto that receives small electric motors from a manufacturer located in Winnipeg. The demand for motors is 118,000 units per year. The cost of each motor is $125. The motors are purchased in lots of 3.400 units. The ownership of motors transfers to the appliance manufacturer in Winnipeg. The question is which mode of transportation, truck or train, the appliance manufacturer should use to bring the motors from Winnipeg to Toronto. The railroad company charges $3 per motor. and it takes approximately seven days by train. The trucking company charges $5 per motor, but it takes only three days. The appliance manufacturer will keep 1,400 units as safety stock if a truck is used and 2.500 units as safety stock if a train is used for transportation. Assume 365 days per year. If the holding cost rate is 25 percent of unit cost per year, which mode of transportation will minimize total transportation and in-transit and safety…
- Which of the following is a software used by Nestle to Fast Logistics? a. Honeywell b. SAP c. Aquila d. All of the aboveFAS (Free alongside Ship) and FOB (Free on Board) are rules for which kind of transport?the documents describe the agreement that the company has with its carrier in the shipment of goods. which one? A) Bill of lading B) sales order C) packing slip D) picking ticket