a. Using the normal times for each activity, what is the earliest date you can complete the project? The corresponding project duration using the normal times is days. (Enter your response as an integer.)
Q: MGR Corporation sells table napkins. These are sold by dozen per package for Php 20. They sell 2,000…
A: EOQ stands for economic order quantity. It is a company's optimal order quantity that undervalues…
Q: • Jobs on the production line needs to be scheduled in which we can reach the minimum lateness rate.…
A: Scheduling can be done by various methods namely: SPT: shortest processing time EDD: earliest due…
Q: How does the lean manufacturing works in improving the performance of organization?
A: Lean manufacturing s the concept that mainly focus on minimizing waste during the manufacturing…
Q: What are the benefits of supply-chain management?
A: Supply chain management is one of the most important aspects of business, with one study from…
Q: highlighting th ervices it prov
A: With unprecedented amounts of containerized commerce, the Port of Los Angeles has maintained its top…
Q: Sunrise is planning its purchases of ingredients for bread production. If bread demand had been…
A: Exponential smoothing could be a statistic statement technique for univariate information that may…
Q: List the major activities in operations management.
A: Operations management is the management in which raw materials and resources used in the production…
Q: Problem 6-16 (Algo) The desired daily output for an assembly line is 540 units. This assembly line…
A: Given data is Desired output = 540 units Operating time = 630 minutes
Q: Why is maintenance schedule needed by the maintenance team/department ?
A: Maintenance Scheduling: Maintenance scheduling is defined as it is a kind of…
Q: A food processor uses about 11,250 pounds of wheat each week. The food processor estimates their…
A: Given data Weekly demand = 11250 pounds of wheat Week in a year 52. Hence, annual demand or total…
Q: Q3:A/ Find the solution to the following linear programming problem by dual simplex method Min Z=…
A: It's important to remember that perhaps the conventional (primal) simplex approach is a method that…
Q: How is the production of services different from the production of manufactured goods?
A: Service production is the process of delivering the services to the final consumers. Goods…
Q: According to the Job Characteristics Approach' of Job Design, a technician who has full authority to…
A: Job Design is a psychological philosophy of inspiration that is definite as the systematic and…
Q: Caroline, the owner of Caroline's Boutique, Ltd., estimates that she will sell $20,000.00 worth of a…
A: Inventory control is an important aspect of any business. It is a process of measuring the inventory…
Q: Which of the following statements is/are true regarding EOQ? a. At EOQ, total inventory cost is…
A: EOQ = ((2DS)/H)1/2 where: D= annual demand S = ordering cost per order H= holding cost per unit
Q: erformance metrics.
A: ERP is an interaction utilized by organizations to oversee and incorporate the significant pieces of…
Q: (i) (ii) (iii) (g) Draw an appropriate network diagram to correctly represent the project. Calculate…
A: The critical path is used to know the total project completion duration of a project.
Q: 21. The Bayside Art Gallery is considering installing a video camera security system to reduce its…
A: a and b
Q: Why do organizations choose rigid processes over flexible ones?
A: Each business has many processes that they have to manage in their day-to-day activities. The type…
Q: 28. Which among the following are not considered to be principles of motion economy. O Equipment…
A: The principles of motion economy is a structure of rules and recommendations which are set to boost…
Q: How can the bargaining power of suppliers and that of buyers impact the industry?
A: The Bargaining Power of Suppliers is one of the factors in Porter's Five Forces Industry Analysis…
Q: Perla Santos has decided to purchase a cellular phone, but she is unsure about which rate plan to…
A: Decision making is the process which helps to identify the best decision based on the consideration…
Q: a) Explain how and why the “Identification of need and Specification of need” happen to be the two…
A: a) The first step in the procurement cycle is identifying the needs and why is it needed. This is…
Q: A plastic bags factory has controls over the quality of the raw material. This type of control is…
A: Feedforward controls take place before a work activity is done. Concurrent controls take place while…
Q: QUESTION 16 The Federal Reserve had a meeting where they announced plans to lower interest rates.…
A: Cap rates, also known as capitalization rates, are a method of estimating and comparing the rates of…
Q: PARTICIPATION 03 Submit one file (Excel, image, etc.) for problem 3.30. Precisely define all the…
A: Given data is Weight of snack bar = 37 grams Weight of ice cream = 65 grams Calories in snack bar =…
Q: Identify and define the six sourcing strategies.
A: Sourcing strategies are a useful part of supply chain and procurement where the firm identifies…
Q: How are approaches that are more conventional and those that are more agile different from one…
A: There are many methods related to project management. All businesses use of or another method to…
Q: 6. The ABC Logistic company buys in lots of 900 boxes for packaging which is yearly supply , the…
A: Given- Annual demand (D) = 900 boxes Ordering cost (S) = OMR 4 Holding cost (H) = 20% × OMR 10…
Q: 28. Mark Perez, a company project manager, takes an average of 15 minutes to complete one project…
A: Given data is Average element-time = 15 minutes Performance rating = 125% Allowance factor = 15%
Q: Use a diagram to show and explain the concept of supply chain management
A: Supply Chain Management A supply chain is a system of retailers, wholesalers, transporters,…
Q: As the pandemic waned, an educational institution was faced with the imperative of refurbishing and…
A: A network diagram is a visual representation of a project which helps to identify the activity…
Q: Eight Flags operates several amusement parks in the Midwest. The company stocks machine oil to…
A: Given data:
Q: IMMEDIATE ACTIVITY PREDECESSORS D a) Choose the corect network to rep OA 08 b) Which activities are…
A: Find the Given details below: Activity ImmediatePredecessors Time(Weeks) A - 4 B - 3 C A 3…
Q: What is responsible marketing, responsible supply chain and operations management?
A: Responsible marketing, responsible supply chain and operations management all have one thing in…
Q: What is Business Analytics and define the role of Business.
A: Note - Hi! Thank you for the question As per the honour code, We’ll answer the first question since…
Q: 4. What is the total carrying cost of Beta per year under the EOQ policy? 5. What is the total cost…
A: EOQ stands for economic order quantity. It is a company's optimal order quantity that undervalues…
Q: In many states, including New York, an operating agreement is required for a limited liability…
A: An operating agreement is nothing but an important document used by the limited liability company…
Q: two station nurses clinic operates where you must visit the first station before the second. The CV…
A: In the question, We have been given the coefficient of variation data, the CV is 0.75, the average…
Q: What are some of the important workplace attitudes that are easily measured? Why might managers in…
A: Work attitudes are the state of mind individual have toward diverse facets of the work atmosphere.
Q: 60. What phase of 5S involves regulating, color-coding tools, and using the red tag system to solve…
A: The concept of 5S is implemented in the workplace, so, we could implement a better working…
Q: In a given high rise building project worth around 2 Billion Pesos, you have completed and worked a…
A: Here, the project is about constructing a high-rise building, the budgeted amount is around 2…
Q: Company XYZ is contemplating a product development program encompassing 6 major projects. The…
A: In this problem, I would solve the LP using the Ms Excel solver tool, step: Go to Data tab>…
Q: Why is it preferable to use ranges of likelihood and consequences when doing risk assessments rather…
A: Risk assessments are necessary to avoid and prevent the negative impacts on a process or the whole…
Q: Round your answer to two decimal places. What is the holding cost for each generator? dollars
A: Hilding cost is the cost that is related to storing the inventory for future use. It includes many…
Q: 7. Competitive position index and calculation of the price/rent for a subject property- example 8.…
A: This index is calculated on the basis of the euro price per square meter for new and used…
Q: Answer the following items: 2. Recommend the appropriate type/s of warehouse/s that will help H&M…
A: Excess inventory is the inventory that is not yet sold. This is the inventory that might be produced…
Q: A company uses approx. 600 units a day & this tends not to vary by more than a few units either way.…
A: Daily demand d = 600 units Demand Standard deviation σd = 0 (As the demand doe not vary by more than…
Q: What is the process of production from raw materials to customers of a vinyl record?
A: A production process involves a method of delivering goods and services to clients through the use…
Q: 26______. McDonald’s, Burger King, and Wendy’s are an example of which of the five forces? a…
A: Here, The five forces consider various competitive forces to implement the business decisions, let's…
Step by step
Solved in 3 steps with 3 images
- You are in charge of a project at the local community center. The center needs to remodel one of the rooms in time for the start of a new program. Delays in the project mean that the center must rent other space at a nearby church at additional cost. Time and cost data for your project are contained in 7.10. Your interest is in minimizing the cost of theproject to the community center.a. Using the normal times for each activity, what is the earliest date you can complete the project?b. Suppose the variable overhead costs are $50 per day for your project. Also, suppose that the center must pay $40 per day for a temporary room on day 15 or beyond. Find the minimum-cost project schedule.11-23 Tom Schriber, the director of personnel of Manage-ment Resources, Inc., is in the process of designing a program that its customers can use in the job-findingprocess. Some of the activities include preparingresumés, writing letters, making appointments to seeprospective employers, and researching companiesand industries. The information on these activities isshown in the following table: (d) Determine the critical path(s) and project com-pletion time. (e) Determine the probability that the project willbe finished in 70 days or less.(f) Determine the probability that the project willbe finished in 80 days or less.scenarios of a project activities (tables given below) and their required times to be completed in addition to their predecessors for developing a Website' : Activity Description Duration (days) Preceding Activities A Determine user needs 8 Review s/w and languages Purchase software 10 Design format and style 10 E Write programs A F Review outcome product with user 12 G Make revisions 4 C H Select server site E I Install on server 14 D, F Test G, H, I 5. Calculate the slack time of the non-critical path activities 6. Identify the critical path (highlight critical path activities) 7. what would happen if activity D revised to take 14 instead of 10 days?
- General Foundry’s project crashing data are shown below. Crash this project to 13 weeks using CPM. What is the final time for each activity after crashing? What is the crash cost per week per activity and the total cost of crashing? TIME (WEEKS) COST ($) ACTIVITY IMMEDIATE PREDECESSORS NORMAL CRASH NORMAL CRASH A — 2 1 22,000 23,000 B — 3 1 30,000 34,000 C A 2 1 26,000 27,000 D B 3 2 48,000 49,000 E C 4 2 56,000 58,000 F C 3 2 30,000 30,500 G D, E 5 2 80,000 83,000 H F, G 2 1 16,000 19,000Normal Time Problem 1 You are the manager of a project to improve a billing process at your firm. The following table contains the data you will need to conduct crashing of the project duration. Indirect costs are $1,600 per week, and penalty costs are $1,200 per week after Week 12. Activity Immediate Predecessor(s) Crash Time (weeks) Normal (Direct) Cost Crash Cost (weeks) ($) ($) A 4 1 5,000 8,000 B 5 2 8,000 11,000 C A 1 1 4,000 4,000 Ꭰ B 6 3 6,000 12,000 E B, C 7 6 4,000 7,000 F Ꭰ 7 6 4,000 7,000 What is the optimum choice for project duration?Find the activity duration (t), latest start (LS) and latest finish (LF) times for activity A. t=? 5 LS=? A 2 16 LF=? O t=11 weeks, LS-5 weeks, LF-16 weeks O t=21 weeks, LS-7 weeks, LF-18 weeks O t=11 weeks, LS=7 weeks, LF=18 weeks O t=11 weeks, LS=18 weeks, LF=7 weeks O t=11 weeks, LS-3 weeks, LF-14 weeks
- Jordanne King, the project manager for Webjets International, Inc., compiled a table showing time estimates for each of the activities of a project to upgrade the company’s Web page, including optimistic, most likely, and pessimistic.a. Calculate the expected time, te, for each activity.b. Calculate the variance, s2, for each activity.Activity Optimistic (days) Most Likely (days) Pessimistic (days)A 3 8 19B 12 15 18C 2 6 16D 4 9 20E 1 4 7scenarios of a project activities (tables given below) and their required times to be completed in addition to their predecessors for developing a Website' : Activity Description Duration (days) Preceding Activities A Determine user needs 8 Review s/w and languages Purchase software 10 Design format and style 10 E Write programs A F Review outcome product with user 12 G Make revisions 4 C H Select server site E I Install on server 14 D, F Test G, H, I 3. Highlight the total time to complete the project (days) 4. Calculate the late finishing time (backwards calculations)The diagram below was developed for the project launch of Kitty Condo, a new product in the luxury cat cage market Suppose that you are interested in finding ways to speed up the project at minimal additional cost Delermine the schedule for completing the project in 26 days at minimum cost Penaltly and project overhead costs are negligible Time and cost data for each activity are shown below Normal Crash Time Cost ($) Time Cost (S) Diagram Activity (days) (days) A. 9 1,300 3,700 B 12 1,050 9. 1,410 6 3,000 4,500 Ensh 10 2,000 2,500 E 650 1,100 1,000 Start B 4 700 G 11 1,550 1,950 600 950 2,200 3. 3,100 Fil in the table below to show the proper schedule for completing the project in 26 days at minmum cost (ie the activity times with crashing for each activity) (Enter your responses as whole numbers.) Time according to Time according to schedule (days) Activity Activity schedule (days) A G. H
- Solve the following project by hand and submit your notes: Activity Normal Time (weeks) Crash Time (weeks) Normal Cost Crash Cost Immediate Predecessor A 4 3 $2,000 $2,100 - B 2 1 $2,200 $2,800 - C 3 3 $500 $500 - D 8 6 $2,300 $2,600 A E 6 3 $900 $1,200 B F 3 2 $3,000 $4,200 C G 4 2 $1,400 $2,000 E, F How long will the project take? What is the total cost to complete the project in normal time? If the project is to be shortened by 1-week, which activity will be reduced and how much will the cost be increased? What is the maximum time that the project can be crashed? How much will the cost increase if it is crashed the maximum?You are in charge of a project at the local community center. The center needs to remodel one of the rooms in time for the start of a new program. Delays in the project mean that the center must rent other space at a nearby church at additional cost. Time and cost data for your project are contained in the table. Your interest is in minimizing the cost of the project to the community center. a. Using the normal times for each activity, what is the earliest date you can complete the project? b. Suppose the variable overhead costs are $50 per day for your project. Also, suppose that the center must pay$40 per day for a temporary room on day 15 or beyond. Find the minimum-cost project schedule.Consider the office renovation project data in Table 7.16. A “zero” time estimate means that the activity could take a very small amount of time and should be treated as a numeric zero in the analysis.a. Based on the critical path, find the probability of completing the office renovation project by 39 days.b. Find the date by which you would be 90 percent sure of completing the project.