An order for 150 units is processed on work centers A and B. It is decided to over lap A and B by splitting the order in to two lots. The set up time for A is 30 min and runtime is 12 min per piece. The set up time for B is 40 min and runtime is 6 min per piece. Set up on B cannot start until the first batch arrives. There is no wait time between A and B or between B and stores. Move time between A and B is 10 min. The move into stores is 15 min. There is no queue at either station. What is optimal size of the first transfer Batch? [Select] What should be the size of the second batch? [Select] How long will operation A take? [Select] How long will operation B take? [Select] Calculate total manufacturing lead time for the entire process. • SUA = Set up time operation A SUB= Set up time operation B . • RTA = Run time per piece operation A • RTB = Run time per piece operation B . • QT = Total order size T1 = size of the first transfer batch [Select] T₁ > = QTXRTA-SUB RTA+RTB

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 111P
icon
Related questions
Question

Please answer this. C,D,E

An
order for 150 units is processed on work centers A and B.
It is decided to over lap A and B by splitting the order in to two lots.
The set up time for A is 30 min and runtime is 12 min per piece.
The set up time for B is 40 min and runtime is 6 min per piece.
Set up on B cannot start until the first batch arrives.
There is no wait time between A and B or between B and stores.
Move time between A and B is 10 min.
The move into stores is 15 min.
There is no queue at either station.
What is optimal size of the first transfer Batch? [Select]
What should be the size of the second batch? [Select]
How long will operation A take?
How long will operation B take?
[Select]
[Select]
Calculate total manufacturing lead time for the entire process.
• SUA Set up time operation A
• SUB = Set up time operation B
• RTA = Run time per piece operation A
• RTB = Run time per piece operation B
• QT = Total order size
• T1 = size of the first transfer batch
[Select]
T₁
=
QTXRTA-SUB
RTA+RTB
Transcribed Image Text:An order for 150 units is processed on work centers A and B. It is decided to over lap A and B by splitting the order in to two lots. The set up time for A is 30 min and runtime is 12 min per piece. The set up time for B is 40 min and runtime is 6 min per piece. Set up on B cannot start until the first batch arrives. There is no wait time between A and B or between B and stores. Move time between A and B is 10 min. The move into stores is 15 min. There is no queue at either station. What is optimal size of the first transfer Batch? [Select] What should be the size of the second batch? [Select] How long will operation A take? How long will operation B take? [Select] [Select] Calculate total manufacturing lead time for the entire process. • SUA Set up time operation A • SUB = Set up time operation B • RTA = Run time per piece operation A • RTB = Run time per piece operation B • QT = Total order size • T1 = size of the first transfer batch [Select] T₁ = QTXRTA-SUB RTA+RTB
Expert Solution
steps

Step by step

Solved in 7 steps with 5 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,