Answer the given question with a proper explanation and step-by-step solution. You are asked to pick up a project on building highways to connect all cities in the country. The cost of building a highway between two cites i and j is c(i, j) > 0. If you were in charge from the beginning, this would have been a minimum spanning tree problem and could be solve easily with the algorithms covered in class. Since you pick it up halfway, however, some suboptimal choices have already been made by your predecessor. In other words, highways were already built between some pairs of cities. Design an algorithm to find a cost minimizing set of highways to built subject to the choices already made
Answer the given question with a proper explanation and step-by-step solution.
You are asked to pick up a project on building highways to connect all cities in the country. The cost of building a highway between two cites i and j is c(i, j) > 0. If you were in charge from the beginning, this would have been a minimum spanning tree problem and could be solve easily with the algorithms covered in class. Since you pick it up halfway, however, some suboptimal choices have already been made by your predecessor. In other words, highways were already built between some pairs of cities. Design an
Do not copy others.
Step by step
Solved in 2 steps with 1 images