Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 IV 0.89 2.73 10

Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
5th Edition
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Saeed Moaveni
Chapter20: Engineering Economics
Section: Chapter Questions
Problem 34P
icon
Related questions
Question

A proposed embankment fill requires 7500 m3 of compacted soil. The void ratio of the
compacted fill is specified as 0.7. Soil can be transported from one of the four borrow
pits, as described in the following table. The void ratio, specific gravity of soil solids,
and the cost per cubic meter for moving the soil to the proposed construction site are
provided in the table.
a. Determine the volume of each borrow pit soil required to meet the specification of
the embankment site.
b. Make the necessary calculations to select the borrow pit which would be most costeffective.

Borrow pit
Void ratio
G,
Cost ($/m³)
I
0.85
2.66
11
II
0.92
2.69
8
III
1.21
2.71
IV
0.89
2.73
10
Transcribed Image Text:Borrow pit Void ratio G, Cost ($/m³) I 0.85 2.66 11 II 0.92 2.69 8 III 1.21 2.71 IV 0.89 2.73 10
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning