Loans are evaluated in a process with two resources. The first resource has a capacity of 0.33 loans per minute. The capacity of the second resource is 0.61 loans per minute. Demand for this process is 0.41 loans per minute. Instruction: Round your answer to three decimal places. What is the cycle time of this process (in seconds)? 137.561 seconds
Q: b. Suppose that the number of workers at each stage are as follows: Stage Number of Workers A 4 D E…
A: Output at each stage: The output of stage A = 605per hour = 12 per hour The output of stage B =…
Q: Donut Love makes hand made artisan donuts in several locations throughout New Hampshire,. Assume…
A: Step Number of parallel stations/Resources Processing time for each resource (min/unit) Prep 1 30…
Q: 1. Jeans manufacturing plant operation is one shift per day at 100% efficiency. Workers of this…
A: The takt time is time is the maximum acceptable time to meet the demands of the customer. In other…
Q: A food-truck can produce 20 meals per hour. The demand rate is, however, only15 meals per hour. (a)…
A: Formula:
Q: Consider a process consisting of five resources that are operated 8 hours per day. Theprocess works…
A: Given data is Product A = 40 units per day Product B = 50 units per day Product C = 60 units per day…
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Takt time is described as the time or the rate at which products are needed to be manufactured in…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: People are served in a process with two resources. The first resource has a capacity of 2 people per…
A: The detailed solution is given in Step 2.
Q: What cycle time would match capacity and demand if demand is 120 units a day, there are twoshifts of…
A:
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: Lead time is the lenght of time required from the start of process till its completion. Bottleneck…
Q: Diners are served in a process with two resources. The first resource has a capacity of 0.9 diners…
A: The total labor content is defined as the time sum of all process steps. First Resource Capacity =…
Q: A toy company has decided to manufacture a new toy tractor, the production of which is broken into…
A: Cycle time = Operating Time/desired Output = 40 x 60 x 60/4700 = 30.63 seconds per…
Q: calculate takt time in seconds
A: Takt time refers to the rate at which a product must be completed for meeting the demand.
Q: Compute the takt time for a system where the total time per shift is 420 minutes, there is one…
A: The answer is as below:
Q: What is the effect of waiting time on a manufacturing process? Why is it good to reduce waiting…
A: Waiting time essentially affects producing measure. The longer the cycle is in pausing, the higher…
Q: A production line at V. J. Sugumaran’s machineshop has three stations. The first station can process…
A: Given that: Station 1 can process one unit in 10mins. Station 2 has two identical machines and can…
Q: People are served in a process with two resources. The first resource has a capacity of 1.4 people…
A: Given, Total capacity of resource = Capacity * Number of workers Additional worker = 3+1 = 4 Total…
Q: First question in the image Question N0 2: A production line has an hourly throughput rate 6…
A: Given data - Task A Task B Processing time (Min) 9 12 No. of worker 1 1
Q: The three-station work cell illustrated in the figure below has a product that must go through one…
A: Hello thank you for the question. As per guidelines, we would provide only 3 sub-parts at a time.…
Q: If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily…
A: Bottleneck cycle time is the longest time in the entire process. In the given question there are two…
Q: Process D has five activities in a straight line. The cycle time for Activity 1 is 10 seconds,…
A: Given data Cycle time of Activity 1= 10 seconds Activity 2= 35 seconds Activity 3= 30 seconds…
Q: Suppose a bank clears checks drawn on customers’ checking accounts by using the following process:…
A: Answer a. The capacity of the banking system is determined by the capacity of the bottleneck of the…
Q: The needed capacity requirement is nothing customers per day.
A: In the above question it is given that the process currently serves average of 61 customers, and 10%…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: Cans are made in a process with two resources. The first resource has a capacity of 11 cans per…
A: Given: 1st resource capacity =11 cans/sec2nd resource capacity =10 cans/sec 1st resource has workers…
Q: Consider a production line with five stations. Station 1 can produce a unit in 9 minutes. Station 2…
A: Given data is
Q: Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per…
A: Given - Process Demand = 7.2 meals per hour 1st Resource capacity = 9.5 meals per hour 2nd Resource…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 30 loans…
A: Given, First resource capacity = 30 loans / hour Second resource capacity = 38 loans / hour Demand =…
Q: The Stylish Hair Salon has three stylists who provideservices to women. After checking in with the…
A: Given Check-in time - 1 minute Customer’s washing, drying, and styling - 25 minutes Payment - 3…
Q: A work center assigns tasks to 7 work stations. The total of all the task times is 24. If the cycle…
A: Remember the formulas for this problem Total time taken = No. of stations * Cycle time Efficiency =…
Q: What are the capacity requirements for the next four years? (Assume that there is no learning.)…
A: Plastic sprinklers:1 machineCapacity 240,0005 workersTotal available capacity = 240,000 * 1 =…
Q: Which operation is the bottleneck of this process? a. Stocking b. Pricing c. Spotting d. Shipping…
A: An operation that takes the maximum time to complete its task in a supply chain for a particular…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: Loans are evaluated in a process with two sequential resources. The capacities of the resources are…
A: Given, Loans are utilized in a process with two sequential resources with, Capacity C1 =0.16 loans…
Q: 30,000-seat college football stadium is used 18 times for games, concerts, and graduation…
A: It is given that the stadium has been used 18 times. So, the Resource used = 18 times
Q: Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Formula:
Q: Based on the data from the below table: b. What is the system capacity in the total number of car…
A: Bottleneck process is an activity in a process which reduces the total capacity of the process. The…
Q: Four employees at a fast-food restaurant each perform one of the four activities in serving a…
A: From the above given information, Greet customer = 2 seconds Taking order = 30 seconds Processing…
Q: What is the new capacity of this process? _____ apples per minute
A: Capacity is the amount that something can be produced.
Q: a) The throughput time of the new work cell is minutes (enter your response as a whole number). b)…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: 7. Compute the takt time for a system where the total time per shift is 480 minutes, there is one…
A: Given data; Total time per shift 480 min No. of shifts 1 shift Rest break 30 min Lunch…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Number of resources = 2 The capacity of resource 1 = 2.1 Apples pe minute The capacity of resource 2…
Q: e Stylish Hair Salon has three stylists that provide services to women. After checking in with…
A: Bottleneck is the congestion point in a production process that occurs when the workloads arrive…
Q: The Stylish Hair Salon has three stylists who provide services to women. After checking in with the…
A: We have, Processing time per customer for receptionist = 1 +3 = 4 minutes per customer Processing…
Q: Xercise only contains parts and g. ) The cycle time for the production of a chair is 9.23 minutes…
A: Below is the solution;-
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Process cycle time indicating the average time required to complete a unit of item. Here, we can…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 21…
A: Given: Process Demand = 16 application/hourThe capacity of 1st resource = 21 Applications/hour The…
PLEASE I NEED TO UNDERSTAND STEP BY STEP THE CALCULATIONS
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- C&A Candy produces two kinds of gumdrops: regular and sugar-free. The data on these gumdrops are given below: Regular Sugar-Free 30 10 60 30 80 80 Demand (lbs per hour) Changeover time (min) Production rate (lbs per hour) C&A first makes 60 pounds of regular gumdrops, then 20 pounds of sugar-free gumdrops, and then repeats this sequence. What is the utilization of the production process? Multiple Choice O O O 25% 20% 50% 40%Additional Algo 4-9 Add N workers Drivers are trained in a process with two resources (workers in each resource work independently). The processing time (per worker) of the first resource is 38 hours. The processing time (per worker) of the second resource is 71 hours. The first resource has 4 workers and the second resource has 7 workers. Assume 4 workers are added to the bottlenck resource. Instruction: Round your answer to three decimal places. What would be the capacity of this process? drivers per hourNavern Corporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 141 days. The 141 days are spent as follows: Wait time Inspection time Process time Move time Queue time What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Choice O O 41.1% 30.4% 58.9% 29 days 24 days 34 days 31 days 23 days 57.4%
- People are served in a process with two resources. A worker in the first resource serves 28 people per hour and a worker in the second resource serves 14 people per hour. The first resource has 3 workers and the second resource has 5 workers. Demand occurs at the rate 1.4 people per minute. Instruction: Round your answer to one decimal place. What is the implied utilization (%) of the second resource? %Kitty Wonderland (KW) makes toys for cats. KW’s managers have recently learned that they can calculate the average waiting time for an order from the time an order is received and the time it is manufactured. They have asked for your help and have provided the following information. Expected number of orders for the product: 2,000 Manufacturing time per order: 4 hours Annual machine capacity in hours: 10,000 After learning about the average waiting time, KW’s managers are confused. They do not understand why, if annual machine capacity is greater than the average number of orders for the product, there would be any waiting time at all. Briefly answer the following questions Calculate the average waiting time per order. The managers have asked for your suggestions on what they can do to minimize or eliminate waiting time. How would you respond? Management is expecting sales to increase. Will average waiting time increase or decrease? Explain briefly.A process consists of 3 resources. Assume there exists unlimited demand for product, Resource 1 has processing time of 6 minutes per unit. Resource 2 has processing time of 4 minutes per unit. Resource 3 has processing time of 3 minutes per unit. All resources are staffed by 1 worker and each worker gets paid $ 12 per hour. What is the cost of direct labor ? How much idle time does worker at resource 3 have ? What is the average labor utilization ? Assume the demand rate is 20 units per hour, what is the Takt time ? Assume the demand rate is 20 units per hour, what is the Target manpower ? Show all formulas, calculations and results. Do on Canvas
- Chairs are made in a process with a single resource. There are two types of chairs. The resource's processing time for the first type is 30 minutes and demand for this type is 2.3 chairs per hour. The resource's processing time for the second type is 23 minutes and demand for this type is 2.8 chairs per hour. There is 1 worker at this resource. Instruction: Round your answer to one decimal place. What is the implied utilization (%) of this resource?A machine operates with the following production cycle: 15 minutes of setup,45 minutes of production. While in production the machine produces 2 parts per minute.What is the capacity of the machine in parts per minute?Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples per minute. The capacity of the second resource is 4.4 apples per minute. Demand for this process is 1.6 apples per minute. Instruction: Round your answer to three decimal places. What is the cycle time of this process (in seconds)? seconds Next Prev 24 of 24 AC Sraw
- A department works one 8-hour shift, 250 days a year, and has these figures for usage of amachine that is currently being considered:ProductAnnualDemandStandard ProcessingTime per Unit (hr)Processing TimeNeeded (hr)1 400 5.0 2,0002 300 8.0 2,4003 700 2.0 1,4005,800Units of capacity needed = Processing time needed ___________________________ Processing time capacity per unit (5–3)Working one 8-hour shift 250 days a year provides an annual capacity of 8 × 250 =2,000 hours per year. Consequently, three of these machines would be needed to handle therequired volume:5,800 hours __________________ 2,000I submitted this question a couple days ago. However, I am still a little confused. Here was the original question: Collins Little Company has a staff of 4 employees, each working 8 hours per day at a rate of $20/hour. Their overhead expenses are $200/day. Collins processes and closes on 12 titles each day. They are considering purchasing a computerized title search system that will allow the processing of 20 titles per day. With the new system, they could cut their staff to 2 employees working the same hours at the same pay, but their overhead expenses would double to $400 per day. 1. Compute the labor productivity with the old system (in titles / hour). 2. Compute the labor productivity with the new system (in titles / hour). 3. Compute the multifactor productivity with the old system (in titles / dollar). 4. Compute the multifactor productivity with the new system (in titles / dollar). One of the answers is: Labor Productivity = 12/(4*8) Another is: Labor Productivity =…Drivers are trained in a process with two resources. The processing times for the resources are 32 and 140 hours. The first resource has 1 worker and the second resource has 5 workers. Demand occurs at the rate 0.025 Drivers per hour. Instruction: Round your answer to one decimal place. What is the implied utilization (%) of the second resource? %