The complete and proper assembly of a certain airplane model requires installing 24,000 rivets. The table below shows the number of missing rivets at the end of this airplane assembly line during several days. Airplane %23 # of missing rivets # of missing rivets # of Airplane missing rivets Airplane # #3 201 210 12 218 14 16 202 203 211 212 219 220 23 11 14 16 204 205 206 213 214 221 222 223 224 225 19 10 11 25 22 15 8 215 216 217 |7 28 15 207 208 11 209 21 Assuming that each airplane is one sample, and the process was believed to be under control when this data was collected, what would be the control chart limits for an np-chart using this data? UCL=25.278, LCL=2.802 UCL=12.6388, LCL=1.4011 UCL=14.0985, LCL=13.9815 O UCL=0.001053, LCL=0.000116 O UCL=14.0417, LCL=14.0382

Glencoe Algebra 1, Student Edition, 9780079039897, 0079039898, 2018
18th Edition
ISBN:9780079039897
Author:Carter
Publisher:Carter
Chapter10: Statistics
Section10.3: Measures Of Spread
Problem 1GP
icon
Related questions
icon
Concept explainers
Topic Video
Question
The complete and proper assembly of a certain airplane model requires installing 24,000 rivets. The
table below shows the number of missing rivets at the end of this airplane assembly line during
several days.
# of
Airplane
missing
rivets
# of
missing
rivets
# of
Airplane
missing
rivets
Airplane
#3
#3
201
18
210
12
218
14
202
16
211
23
219
11
203
204
14
212
16
220
9
19
213
9
221
222
10
22
7
205
11
214
25
206
15
215
15
223
207
8
216
9
224
28
208
11
217
225
209
21
Assuming that each airplane is one sample, and the process was believed to be under control when
this data was collected, what would be the control chart limits for an np-chart using this data?
UCL=25.278, LCL=2.802
UCL=12.6388, LCL=1.4011
UCL=14.0985, LCL=13.9815
UCL=0.001053, LCL=0.000116
O UCL=14.0417, LCL=14.0382
Transcribed Image Text:The complete and proper assembly of a certain airplane model requires installing 24,000 rivets. The table below shows the number of missing rivets at the end of this airplane assembly line during several days. # of Airplane missing rivets # of missing rivets # of Airplane missing rivets Airplane #3 #3 201 18 210 12 218 14 202 16 211 23 219 11 203 204 14 212 16 220 9 19 213 9 221 222 10 22 7 205 11 214 25 206 15 215 15 223 207 8 216 9 224 28 208 11 217 225 209 21 Assuming that each airplane is one sample, and the process was believed to be under control when this data was collected, what would be the control chart limits for an np-chart using this data? UCL=25.278, LCL=2.802 UCL=12.6388, LCL=1.4011 UCL=14.0985, LCL=13.9815 UCL=0.001053, LCL=0.000116 O UCL=14.0417, LCL=14.0382
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Knowledge Booster
Sample space, Events, and Basic Rules of Probability
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Glencoe Algebra 1, Student Edition, 9780079039897…
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
College Algebra (MindTap Course List)
College Algebra (MindTap Course List)
Algebra
ISBN:
9781305652231
Author:
R. David Gustafson, Jeff Hughes
Publisher:
Cengage Learning
Big Ideas Math A Bridge To Success Algebra 1: Stu…
Big Ideas Math A Bridge To Success Algebra 1: Stu…
Algebra
ISBN:
9781680331141
Author:
HOUGHTON MIFFLIN HARCOURT
Publisher:
Houghton Mifflin Harcourt