The lowest portion of the capacity-elevation curve of a proposed irigation reservoir, draining 20 km? of catchment, is represented by the following data in Table 2. The rate of silting for the catchment has been assessed to be 25 m/km2/month. Assuming the life of the reservoir to be 5 decades. a) Determine the dead storage and the lowest sill level (LSL) if the main canal is 6 km long with the bed slope of 1 in 1000, and the canal bed level at the tail end is at RL 594.5 m. The Full supply discharge (FSD) of the canal at the head is 0.08 m and the

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter7: Seepage
Section: Chapter Questions
Problem 7.6P
icon
Related questions
Question
2. The lowest portion of the capacity-elevation curve of a proposed irrigation reservoir,
draining 20 km? of catchment, is represented by the following data in Table 2. The rate of
silting for the catchment has been assessed to be 25 m/km2/month. Assuming the life of the
reservoir to be 5 decades.
a) Determine the dead storage and the lowest sill level (LSL) if the main canal is 6 km
long with the bed slope of 1 in 1000, and the canal bed level at the tail end is at RL
594.5 m. The Full supply discharge (FSD) of the canal at the head is 0.08 m and the
crop water requirement is assessed as 250 Ha.m.
b) Compute the gross capacity of the reservoir if the dependable yield of the catchment is
estimated to be 0.29 m.
Table 2
Elevation (m)
Capacity (Ha.m)
RL 600
24.2
602
26.2
604
30.3
606
36.8
Transcribed Image Text:2. The lowest portion of the capacity-elevation curve of a proposed irrigation reservoir, draining 20 km? of catchment, is represented by the following data in Table 2. The rate of silting for the catchment has been assessed to be 25 m/km2/month. Assuming the life of the reservoir to be 5 decades. a) Determine the dead storage and the lowest sill level (LSL) if the main canal is 6 km long with the bed slope of 1 in 1000, and the canal bed level at the tail end is at RL 594.5 m. The Full supply discharge (FSD) of the canal at the head is 0.08 m and the crop water requirement is assessed as 250 Ha.m. b) Compute the gross capacity of the reservoir if the dependable yield of the catchment is estimated to be 0.29 m. Table 2 Elevation (m) Capacity (Ha.m) RL 600 24.2 602 26.2 604 30.3 606 36.8
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Principles of Seepage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning