assembly line has three tasks with respective task times: 5 minutes 5 minutes 6 minutes cycle time for the line is 6 minutes. output is.
Q: Corner points of the feasible region: If there is more than one corner point, type the points separa...
A:
Q: i. What are the 3-months moving average forecasts for months 4, 5, 6 & 7? ii. What are the 3-month W...
A: Forecasting is estimated predictions for the present as well as for the future as per the past data....
Q: Given the following MRP matrix for Item D, the planned order receipt for period 4 is ITEM: D Period ...
A: An MRP table helps to plan the ordering process and manage the receiving process of materials. The g...
Q: Network Diagrams Exercise 1. For each task build the relevant network diagram 2. Add the task durati...
A: Critical path analysis is done to identify the path with longest duration to complete the whole proj...
Q: Three jobs are to be scheduled on two machines A and B. Assume that the jobs are processed in the se...
A: Job A B 1 5 4 2 7 7 3 3 5
Q: Shown below are the tasks, times, and precedence requirements for the work required to assemble a co...
A: A product line is a model of network diagram which contains the workstation allocation in it. Here, ...
Q: You've just been appointed as the new regional manager at a supermarket, and your first task is to d...
A: Inventory cost comprises the amount to order and holds stock or inventory, along with governing of t...
Q: Bakery A uses the newsvendor model to manage its inventory of bread loat Bakery A sels bread for $46...
A:
Q: The standard time fixed for the worker is 20 hours to complete a job. If a worker completes the job ...
A: Given data The standard time fixed for employees = 20 hours Time taken by a worker in job completi...
Q: Normal No Spacing Replace Reu Heading 1 Fil Paragraph Styles Editing Reuse Item SKU A3378 has a dema...
A: Given data: Demand during lead time = 360 units Standard Deviation (σdLT) = 12 Stock out = 10% Servi...
Q: In quality assurance, reduction of variations allows us to increase the control limits and have a sa...
A: Reduction of Variation: Reduction of variation is defined as reduce the product vari...
Q: CASE NO.4 4. The National Dog Food Corp. wants to mix 5000lb of special dog food. There are two prin...
A: Given data is Cost of x1 = Php 30 Cost of x2 = Php 60 Limitation of x1 = less than or equal to 4000 ...
Q: The monthly sales for Yazici Batteries, Inc., were as follows: ...
A: The trend projection approach is based on the premise that the factors that influenced past trends i...
Q: Respond to the following - the importance of the location decision is sometimes massively overrated ...
A: To be determined: the importance of the location decision is sometimes massively overrated and the f...
Q: an you list the important of work measurement in healthcare system
A: The question has been asked to list the importance of work measurement in the healthcare system, Wit...
Q: As you have asked for the whole case stidy: Founded at the turn of the 20th Century as a maker of ...
A: Find the Given details below: Given details: Sample Number Sales unit Description Sales unit Co...
Q: The initial tableau of a linear programming problem is given. Use the simplex method to solve the pr...
A: The initial tableau can be written as follows.
Q: The Dutch Railway system processes 1.3 million passengers and more than a million tons of cargo dail...
A: given, Planning for the future To achieve the projected capacity growth for the Traffic Control busi...
Q: Question One A regional conglomerate is about to upgrade its customised accounting software System 2...
A: Given data is
Q: Discuss the several types of changes that may suggest a need to revaluate and/or redesign firm's log...
A: A logistics network is an effective logistics network modeling to move goods from their raw state th...
Q: Discuss the four (4) important categories of users when identifying stakeholders within a project ma...
A: Project management plan refers to the formal document which states the project outlines i.e., how a ...
Q: The Sunrise Raisin Company makes three different products from raisins: natural raisins (Natural), l...
A: Given data is Production of natural product = 500 pounds Production of light product = 50 to 600 po...
Q: we have three Counthiès A, Rc in Solving the prablemot tutegration Heep in produets the humberof Pis...
A: Find the Given details below: Given details: P1 P2 P3 A 8 7 6 48 B 13 11 12 12 C 9 9...
Q: subject to X1 – 2x, + x, 2 20 2x, + 4x2 + X3 = 50 and X, 2 0, X2 2 0, X3 2 0. (a) Using the Big M me...
A: Objective Functions and Constraints: Based on the given details, the objective funct...
Q: a. Calculate the expected time and variance for each activity. . Calculate the activity slacks and d...
A: D(duration)=given in the question as normal time ES (Early start)= The first activity from where the...
Q: A circus is scheduled to appear in a city on a given date. The profits obtained are heavily dependen...
A: Find the Given details below:
Q: Compare and contrast descriptive, predictive, and prescriptive analytics.
A: Analytics is described as the process of communicating, interpreting, and discovering patterns in da...
Q: an you Explain in 1000 words, the objectives & importance of Project Management?
A: Project management is defined as the application of the skills, knowledge, tools, and techniques to ...
Q: 1.Compute the multifactor productivity measure for an eight-hour day in which the usable output was ...
A: Multifactorial productivity indicating the proportion between input and outputs. In multifactorial p...
Q: . using sage 50 what steps can we ignore in: -sales process( sales Invoice, Sales Order Sales Quo...
A: PURCHASING PROCESS: Purchasing process, also known as Procure to pay process is a methodology for bu...
Q: What role does collaborative forecasting play in a supply chain of a build to order manufacturer suc...
A: The bullwhip effect in businesses disturb the supply chain at many production and operational level...
Q: Multiple choice need help in completing question 8 and 14. 8. The just-in-time inventory system i...
A: Cost of quality - is described as a process that permits an organization to specify the scope to whi...
Q: Angela manages a store that sells speakers. Each Boomer takes 38 hours to create the plastic pie hou...
A:
Q: From a single outlet with a five-member team back in 2010 to six outlets and a team of 50 members to...
A: given, From a single outlet with a five-member team back in 2010 to six outlets and a team of 50 mem...
Q: Discuss 4. How do you think your staff will react based on the executives' non-engagement.
A: A Small Introduction to Planning Process Planning includes choosing missions and goals and the acti...
Q: What view of globalization is suggested through the New Balance Company?
A: Globalization may be viewed in three ways: (1) as a fresh force sweeping the globe recently, (2) as ...
Q: Suppose the Prime Minister promised to complete the project within 50 days. What are the chances of ...
A: Activity o m p Expected time Variance a 10 22 22 20 4.00 b 20 20 20 20 0.00 c 4 10 16 10 4.00...
Q: What are the Unconfined Compression Machine's OBJECTIVES/PURPOSE and its UNIT? note: specify...
A: The unconfined compression test apparatus is used for an undisturbed sample with its natural moistu...
Q: 13.42 Activity Ais worth $100, is complete, and actually cost $150. Activity B is worth $500, is 75%...
A:
Q: The problem below looks at forecasting methodologies to determine which forecasting model results in...
A: Formulae: For 3 period moving average (SMA) Simple moving average(Ft) = At-1+At-2+At-33Weighted mov...
Q: The two basic modeling approaches for queuing systems are optimization and simulation. a) True b) Fa...
A: A queueing system can be stated as the framework having a facility for service at which units often ...
Q: SELCO has attempted to institutionalize the design process at the company. What are the pros and con...
A: The design process in companies has varying importance depending on the type of product or service t...
Q: The cost of improving the plant layout is $50,000 to be depreciated over a three-year period. The es...
A: Given, Cost of improving the plant layout is $50000 and is depreciated over 3 year period. Annual pr...
Q: PRODUCT MIX: The JP Manufacturing Company produces two products. Resource requirements for productio...
A:
Q: Use the table below to answer the following question(s). In the spreadsheet below, there is data on ...
A: Number of unit sold will be the lowest value between Total Demand and total production quantity. Con...
Q: Describe how your mastery of project management and the concepts in this textbook will enhance at le...
A: The three employability skill that can mastery the project management concepts are:
Q: apestry’s ERP system takes information from point-of-sales systems in stores into a common back-offi...
A: given, The company’s overhaul that has reduced duplication and centralized business operations acros...
Q: In what kind of industries does a localization strategy make sense? When does a global standardizati...
A: A localization strategy generally focuses on incrementing the profitability of the organization by m...
Q: The company L. Houts Plastics is a large manufacturer of injection- molded plastics in North Carolin...
A: Given data is
Q: a) Draw network diagram representing the project b) Find total float & free float for each activity ...
A: D(duration)=given in the question as normal time ES (Early start)= The first activity from where the...
Step by step
Solved in 2 steps with 2 images
- The desired daily ouput for an assembly line is 420 units. This assembly line will operate 595 minutes per day. The following table contains information on the products task times and precedence relationships Task. Task time-seconds Immediate predecessor A. 35 - B. 40 A C 30 A D 40 B E 20 C F 70 C G 45 E-F H 30 D-G The required workstation cycle time to meet the desired output time is 85 seconds Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion The answer gives only 4 workstations as option Have to fill out following Workstation. Task Idle time 1 ?? ?? 2 ?? ?? 3…Waldorf Astoria Spa & Health Club at Waldorf Astoria Chicago offers high-quality hair-styling and physical relaxation services at a reasonable price, so it always has unlimited demand. The process comprised of five tasks that are completed in the sequence described below. (The time required for each task is shown in parenthesis). Task 1: Welcome a guest and offer homemade herb tea (10 minutes) Task 2: Wash and condition hair (10 minutes) Task 3: Neck, shoulder, and back stress release massage (10 minutes) Task 4: Design the hairstyle and do the hair (25 minutes) Task 5: Check out the guest (5 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 completes Task 1. S2 completes Tasks 2 and 3. S3 completes Tasks 4 and 5. Assume a wage rate of $18 per hour. What are the direct labor costs for one guest?Improve the given string diagram by rearranging the work station.
- A company is setting up an assembly line to produce 90 units per hour. The table below identifies the work elements, times, and immediate predecessors. Work Element Time (Sec.) Immediate Predecessor(s) A 25 - B 18 A C 20 A D 5 B, C E 12 C F 8 E G 16 D, F H 12 G What cycle time is required to satisfy the required output? What is the theoretical minimum number of stations?Define Repetitive Processing: Product Layouts?Francis Johnson's plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only five workstations. The tasks and the order in which they must be performed are shown in th following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TIME (MINUTES) IMMEDIATE PREDECESSOR rint TASK A 2.0 B 2.0 3.0 1.0 А, В, с 3.0 2.0 G 3.0 b. What is the workstation cycle time required to produce 15 units per hour? (Round your answer to 1 decimal place.) Workstation cycle time minutes d. Balance the line to use the fewest possible workstations to meet the cycle time found in part b. Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part b? (Round your answer to 1 decimal place.)
- Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96 instruments per 24-hour day. The assembly-line activities ace: Task Time (min) Predecessors A 3 B 6 7 A А, В B D 5 E 2 F 4 C G 5 F D,E H H 1 6 J E K 4 G, I, J 50 (e) With a 10-minute cycle time and six workstations, what is the efficiency? (1) What is the total idle time per cycle with a 10-minute cycle time and six workstations? (g) What is the best work station assignment you can make without exceeding a 10-minute cycle time and what is its efficiency?As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 230 units per 8-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.2 - b 0.6 a c 0.4 b d 0.7 - e 1.6 d f 1.8 c g 2 e, fThe City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: Code A B с D E F G H I Description Find location; determine resource requirements Requisition of lumber and sand Dig and grade Saw lumber into appropriate sizes Position lumber in correct locations Time (hrs) 20 60 100 30 20 10 20 10 30 Nail lumber together Put sand in and under the equipment Put dirt around the equipment Put grass all over the garden, landscape, paint Refer to the legend for the activity that corresponds to each code. Using the line drawing tool, draw a Gantt chart for activites E through I of the project. Immediate Predecessor(s) None A A B D, C E F F G, H A B C- D- E F G H- H 0 20 40 60 80 100 120 140 160 180 200 Q ✔
- A Manufacturing Corp. with three-station work cell has the process displayed below. Each workstation has only one worker to the assigned activity. Single order arrives every 7.5 hours.a) What is the minimum throughput time and WIP of this work cell?b) What is the maximum throughput? IN Station 1 OUTTask Time: 3 hrs.Station 2Task Time: 5 hrs.Station 3Task Time: 2 hrs ??Why a product layout a typical in service environment?Dr. Lori Baker, operations manager at Nesa Electro-nics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96 instruments per24-hour day. The assembly-line activities are: TASK TIME (min) PREDECESSORSA 3 —B 6 —C 7 AD 5 A, BE 2 BF 4 CG 5 FH 7 D, EI 1 HJ 6 EK 4 G, I, J 50a) Draw the precedence diagram.b) If the daily (24-hour) production rate is 96 units, what is thehighest allowable cycle time?c) If the cycle time after allowances is given as 10 minutes, whatis the daily (24-hour) production rate?d) With a 10-minute cycle time, what is the theoretical minimumnumber of stations with which the line can be balanced?e) With a 10-minute cycle time and six workstations, what is theefficiency?f) What is the total idle time per cycle with a 10-minute cycletime and six workstations?g) What is the best workstation assignment you can makewithout exceeding a 10-minute cycle time, and what is itsefficiency?