Use the information in the table to sketch the AON network and compute early start and finish times ,late start and finish times, total slack for each activity. Activity Time Predecessor A 8 B 4 A C 5 B, F D 12 A E 8 D F 4 D G 9 E, F
Q: T1 ? T50 $50 T100 $45 T200 $40 T5000 ? 2) Using the k value for MH's learning rate, what are the…
A: Given, T50 = $50 T100 = $45 T200 = $40 T1 = ? T5000 = ? Formula for value at a time period Tn, Tn =…
Q: In your opinion, why designs that have been developed through a DFMA process are notable? 5
A: Design for manufacturing and assembly (DFMA) is a process method to create easiness for…
Q: (Cross-Docking at Walmart v1) Suppose Walmart reduces cross-docking and fewer shipments are…
A: Introduction Cross-docking is a common term used in supply-chain management. Cross-docking is the…
Q: In a 3 x 3 transportation problem, let xij be the amount shipped from source i to destination j and…
A: Find the Given details below: Given details: 1 2 3 Supply ui 1 C11 C12 C13 15 -2 2 C21…
Q: The expected times and variances for the project activities are given below, critical path is…
A: Given- Critical path = A→D→F→HDesired project completion time (μ)= 29 periods
Q: Explain the role of person with control in relation to safe design processes?
A: Safe design is crucial for building projects as it provides a team-based approach to risk…
Q: or a company? How can it prevent itself from becoming too large for its present infrastructure?
A: All of our enterprises rely on ERP as a piece of software to help us accomplish our goals. The ideal…
Q: nagement, such as profits, life cycle costs, tangible and intangible costs and benefits, direct and…
A: The procedures necessary to guarantee that a project team completes a project within an authorized…
Q: 4) Max Z = 4x1 + 8x2 s.t. 2x1 + 4x2 < 14 6x1 + 2x2 ≤ 12 Xi ≥0 Problem 4 should be graphed first.…
A: Given data is Max Z=4x1+8x2 Subject to constraints: 1.) 2x1+4x2≤142.) 6x1+2x2≤12xi≥0
Q: er industries can you think of which may be prone to this kind of business model disruption? Where…
A: Consumers can participate in the creation or consumption of commodities, services, and products in…
Q: Brown and Brown Electronics manufactures a line of digital audiotape (DAT) players. The bill of…
A: Instructions and formula used: Projected on hand = Planned order receipts + ending inventory…
Q: What factors probably led to this pay package?
A: Best Buy defended the agreement by stating that while it was need to make up for the money Mr. Joly…
Q: The Activity on node diagram in Fig 15.1 was prepared at the beginning of a software update project.…
A: 1. During forward pass in case of more than two preceding activities the early start will be…
Q: DO NOT COPY AND PASTE FROM AN ARTICLE. DO NOT PLAGERIZE. COMPANY IS COLONY HARDWARE SUPPLY! Research…
A: Introduction Colony Hardware Supply is an organization supplying hardware equipment. It provides…
Q: What is the leadership style of the nurse manager, and what are the behavior styles of the staff?
A: The unit nurse administrator has an autocratic management style. Autocratic executives seldom seek…
Q: Your manager is keen to improve your company's supply chain management, in particular to reduce…
A: Supply Chain Management - In general, it is signified as the storage and movement of raw materials…
Q: Question 40 Listen ▶ Which of the following work activities that effectively limits throughput of a…
A: Given data: work activity 1= 240/hr work activity 2= 60/hr work activity 3= 20/hr work activity 4=…
Q: Based on the following payoff table, answer the following: High Low 90 -10 70 40 Lease 60 55 Prior…
A: ANSWER : For the maximum likelihood, we will choose the state of nature with high…
Q: nning. 3b. Explain one (1) of the factors involved in your choice o
A: When we talk about port operations, we're referring to a set of nautical protocols designed to…
Q: Suppose that an organization is engaged in manufacturing and sales of a seasonal product. Based on a…
A: Beginning Inventory = 0Carrying cost =$7For Level production strategy-Production level = Sales per…
Q: A 30% Service Level means that OR=dL R>dL > L OR<dL
A: Service level: Service level is defined as, the probability of satisfying the…
Q: 22. A purchasing agent for a particular type of silicon wafer used in the production of…
A: Given- Annual Demand (D) = 20000Ordering cost (S) = $100Holding cost (H)= 20%
Q: QUESTION 1 (PRODUCTIVITY) A company has introduced a process improvement that reduces processing…
A: Productivity is a concept of measuring the output achieved with provided level of inputs. It is a…
Q: In quality management, it is a fundamental goal to identify processes that are out of control, to…
A: Quality management refers to the concept of maintaining a high and efficient standard of output in…
Q: The Vice President of the Republic of Zambia launched a pilot project to clear canals on the Barotse…
A: Transportation takes place through various means such as roads, rails, seas and airways. Canals is…
Q: A farmer is considering planting live possible crop mixes. The outcomes depend on the weather (dry,…
A: Given- Dry Average Rainy Mix A -1 1 9 Mix B 1 -1 5 Mix C -1 5 4 Mix D 2 2 3 Mix E 5 3…
Q: Suppose you go out shopplng for a new espresso machine and run into MLE player Trea Turner (who…
A: A formal or corporate transaction between the two parties can always in two modes that is either in…
Q: Was Joly overpaid? What factors probably led to this pay package?
A: 1. Joly wasn't overpaid since the average executive's cash pay, given the importance of Best Buy to…
Q: Need typed answer only.Please give answer withi
A: In order to provide people with something of value, project management makes use of certain…
Q: A4. In functional design, we are concerned with the parameters or measures that determine the…
A: Ans) a) Three parameters that determine functional parameters of products are: 1) Reliability 2)…
Q: A product whose EOQ is 120 units experiences a decrease in ordering cost from $90 per order to $10…
A: Companies determine their optimal order size by performing a calculation known as the economic order…
Q: Solve the following LP to obtain the optimal solution using Minimize Z= 10 X1 + 16 X2 + 8 X3 2X1 +…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: A production line is to be designed for a job with four tasks. The task times are 2.7 minutes, 0.4…
A: Given data: Task 1 time = 2.7 minutes Task 2 time = 0.4 minutes Task 3 time = 0.6 minutes Task 4…
Q: For the network below, determine the shortest path b 5 d 5 f a 3 2 3 6 1 5 2 7
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Trucks arrive randomly at the average rate of 5 per hour. A team of four warehouse workers can…
A: Given, Arrival rate a = 5 / hour Service rate s = 10 / hour Wq = a/(s*(s-a))
Q: What information can you get from an average number of jobs (ANJ) in sequencing? a.Higher ANJ means…
A: Introduction In an manufacturing plant, various tasks are lined up to be completed so that other…
Q: 3) Consider the assignment problem having the following cost table. Assignee A B D a) Formulate the…
A: Part (A): Decision Variable: Suppose-Xij be the decision variable that assignee (1=1,2,3,4)…
Q: What would you do? You are a Manager in a Fortune 500 Company with more than 15 employees. A new…
A: There is no predetermined list of reasonable accommodations under the American Disability Act. This…
Q: Q7. The president of Rose Bowl Enterprises, Desmond Howard, projects the firms aggregate DEMAND…
A: Find the Calculation methods below: Output Forecast = (Production - Demand) + Hiring -…
Q: Joe Henry's machine shop uses 2,450 brackets during the course of a year. These brackets are…
A: Annual demand(D) = 2450 Holding cost(H) = $1.65 Ordering cost(S) = $18.50 Lead time(L) = 2 Working…
Q: Question 7 Jus de Fruit Co. has set up for automated production of its new bottled Triple Berry…
A: Given-
Q: Based on the following payoff table, answer the following: High Medium Low 20 5 25 11 13 12…
A: Given-
Q: The company is considering whether or not they should drill the land. The cost of drilling is…
A: 1. EMV for drilling = (0.5 X 0 + 0.3 X 10000000 + 0.2 X 30000000) - Cost incurred in drilling…
Q: One inherent risk to using lean principles is that companies are at higher risk of inventory…
A: The concept underlying lean inventory control is based on eradicating unneeded things & more…
Q: Kelly-Lambing, Inc., a builder of government contracted small ships, has a steady work force of 10…
A: Formulae used: Tn=T1× (nb) where, b=Log RLog 2 Tn=Time to complete nth unit T1=Time to complete…
Q: Amazon Go was made possible by technologies such as computer vision, sensor fusion, and deep…
A: Since you have posted multiple questions, we will solve the first question for you as per our…
Q: Why is Kanban not needed in a perfectly running Just-in-Time system?
A: JIT, or just-in-time, inventory management, involves only ordering products from vendors when they…
Q: Sampling consumer data may be your only option due to time and cost constraints. Yet that will lead…
A: Given: Sample Size (n)=76 Sample Proportion(pˆ)=0.22 Population Size(N)=600 Confidence Interval…
Q: In today's marketplace social media is dominating people's lives and many organizations are still…
A: Introduction: CRM or customer relationship management is a tool through which a company maintains…
Q: ) with strategic goals (4). write a short paragraph explaining and justifying the operational goals…
A: The company Caterpillar Inc. produces heavy machinery and engines. Bulldozers, excavators, wheel…
- Use the information in the table to sketch the AON network and compute early start and finish times ,late start and finish times, total slack for each activity.
Activity |
Time |
Predecessor |
A |
8 |
|
B |
4 |
A |
C |
5 |
B, F |
D |
12 |
A |
E |
8 |
D |
F |
4 |
D |
G |
9 |
E, F |
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Colonial State College is considering building a new multipurpose athletic complex on campus. The complex would provide a new gymnasium for intercollegiate basketball games, expanded office space, classrooms, and intramural facilities. The following activities would have to be undertaken before construction can begin. Activity A B C D E F G H IMG_A2D52FAF8F3D-1.jpeg Activity This answer has not been graded yet. A B с (c) Develop the activity schedule for the project. D Survey building site Develop initial design Obtain board approval E F G Description H Select architect Establish budget Finalize design Obtain financing 0 Hire contractor L L | (a) Draw a project network. (Submit a file with a maximum size of 1 MB.) Choose File No file chosen Immediate Predecessor Earliest Start (b) Identify the critical path. (Enter your answers as a comma-separated list.) 4 A, B с Latest Start с D, E E F, G Time (weeks) 5 5 9 Earliest Finish 13 4 7 15 11 6 9 Latest Finish 4 Slack (d) Does it appear…The following represents a project that should be scheduled using CPM: IMMEDIATE PREDECESSORS ACTIVITY A ABCDEFGH B-E-G-H b. What is the critical path? A-C-F-H OA-D-F-H A-D-G-H A A B C,D D, E F,G Project completion time a LLL23312 TIMES (DAYS) m •WNNW: 3 2 2 3 4 4 4 4 b 5 3 3 4 11 c. What is the expected project completion time? Note: Do not round intermediate calculations. Round your answer to 2 decimal places. days 565Given the following activity network: A2 KI A1 Activity A1 takes 5 weeks, A2 takes 8 weeks, and A3 takes 2 weeks. What is the earliest start time of A3? A) 10 weeks B) 15 weeks C) 7 weeks A3 D) 13 weeks
- Roger Ginde is developing a program in supply chain management certification for managers. Ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. The activities, immediate predecessors, and times appear in the accompanying table: a. the critical activities for the leadership training program development project are: _____ b. the project length for the leadership training program development project= __ days. c. Slack time for each of the activities is: Activity: Slack time: A ______ B ______ C ______ D ______ E ______ F ______ G ______Construct an activity network diagram using Table 3a. Activity A B C D E F G Predecessors - - A A,B D C,E E Expected Time(WKS) 7 9 12 8 9 6 5 Table 3a Activity Durations and relationship Conduct a forward and backwards pass for the activity network diagram that you have constructed and identify the critical path and its duration. Calculate the slack on all of the activities, and proceed to analyze how knowing the slacks can help to manage schedule risk the a project 3b. Assuming that there is the risk of exceeding the project schedule baseline for 7 weeks, critically evaluates the options available that could be used to bring the project on trackThe table below show a set of activities of an IS project,its expected completion time (ET) and preceding activities. Activity Preceding Activity Expected Time (ET) A - 7 B A 9 C A,B 5 D C 17 E C 12 F C 7 G D,E,F 10 H D,G 7 Draw a network diagram for the IS project shown above.,and calculate its earliest completion time (TE), latest completion time (TL) and slack time (ST). If the activity E took 16weeks instead of 12weeks to complete ,what impact will it have on the project duration?
- An activity on a PERT network has these time estimates: optimistic = 2, most likely = 3, and pessimistic = 6. What is its expected activity time and variance? 3.67; 1 O 4.33; 1 O 3.33; 0.44 O 4; 0.44Draw a network diagram showing the linkage between these activities from start to finish. For the diagram, each activity should be labelled alphabetically ie. A, B, C… etc. PERT Formula: TE = (O + 4T + P) / 6 TE = Pert Expected Time Duration, O = Optimistic estimate, P = Pessimistic estimate, T = Most Likely (Typical) estimate Activity Predecessor Optimistic Most Likely Pessimistic Duration Duration in Weeks A — 2 3 4 B — 4 5 7 C B 1 2 3 D C & E 0.5 1 1.5 E B 0.5 1 1.5 F C 2 3 4 G F 2 3 4Draw the PDM network diagram for the following project, calculate the earliest and latest starting and finishing times for all activities, and hence calculate the total float, free float for each activity. Activity IPA Duration (WEEKS) WORKERS REQUIRED PER WEEK EQUIPMENT REQUIRED (hrs/WEEK) H ---- 10 5 8 I H 8 4 2 J H 6 8 6 K J 4 2 1 L J 2 6 2 M J 4 3 2 N I 4 2 0 O I 5 5 0 P I, J 5 6 6 Q L 5 2 0 R M 5 0 4 S N 3 0 4 T Q 3 0 0 U O, S 1 9 8 V K, R 5 14 8 W U 2 6 8 X V 3 6 8 Y P,W,X,T 8 14 8 Z Y 6 5 8 If there is a limit of 15 workers per week, smooth the workers loading using ES and LS histogram. Based on the proposed scheduling, plot the equipment loading histogram for the project. Independently of the above resource leveling, schedule the…
- The director of continuing education at Bluebird University just approved the planning for a sales training seminar. Her administra assistant identified the various activities that must be done and their relationships to each other, as shown in the following table: Click the icon to view the activities. Because of the uncertainty in planning the new course, the assistant also has supplied the following time estimates for each acti Click the icon to view the time estimates. The director wants to conduct the seminar 46 working days from now. What is the probability that everything will be ready in time the standard normal table. (Make sure to round all intermediate calculations for t, and variance to two decimal places) The probability that the seminar will be ready in time is 0.8643]. (Enter your response rounded to four decimal places.)For following data Calculate Duration for each Task, Draw the Network, and find Critical Path. Task Predecessor | Starting Date Finishing Date Start 01/11/2020 | 01/11/2020 A Start 01/11/2020 | 05/11/2020 01/11/2020 | 08/11/2020 08/11/2020 || 12/11/2020 В Start C 05/11/2020 | 17/11/2020 A 12/11/2020 | 16/11/2020 08/11/2020 | 18/11/2020 18/11/2020 | 23/11/2020 23/11/2020 | 23/11/2020 E A&C F В E&F End D>he table below contains data for the installation of new equipment in a manufacturing process for a steel corporation. Your company is responsible for the installation project. Indirect costs are $6,000 per week, and a penalty cost of $10,000 per week will be incurred by your company for every week the project is delayed beyond week 15. Activity Immediate Predecessor(s) Normal Time (weeks) Crash Time (weeks) Normal Cost ($) Crash Cost ($) A None 2 1 7,000 10,000 B None 2 2 3,000 3,000 C A 3 1 12,000 40,000 D B 3 2 12,000 28,000 E C 1 1 8,000 8,000 F D, E 5 3 5,000 15,000 G E 3 2 9,000 18,000 H F, G 8 6 14,000 32,000 Construct a network diagram for the project. What are the project completion time and the total cost under normal conditions? What is the shortest time duration for this project regardless of cost? What is the resulting total cost? What is the…