2. Suppose demand for a power steering gear assembly is given by Week 1 2 3 4 6. 7 8. 9 10 Demand | 45 65 35 40 33 32 25 Currently there are 150 parts on hand. Production is planned by using the fixed order period method with p=2. The lead time is three periods. (a) Determine the planned order release schedule. (b) Assume that a schedule receipt for 50 parts is scheduled to arrive in week five. What changes, if any, need to be made to the scheduled receipt? (c) Applying changed scheduled receipt, using the same lot-sizing and lead time, compute the planned order release schedule.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
answer quick in 30 mins.
2. Suppose demand for a power steering gear assembly is given by
Week
1
2
3
5
6.
7
8.
10
Demand | 45
65
35
40
33
32
25
Currently there are 150 parts on hand. Production is planned by using the fixed order period
method with p=2. The lead time is three periods.
(a) Determine the planned order release schedule.
(b) Assume that a schedule receipt for 50 parts is scheduled to arrive in week five. What
changes, if any, need to be made to the scheduled receipt?
(c) Applying changed scheduled receipt, using the same lot-sizing and lead time, compute
the planned order release schedule.
Transcribed Image Text:2. Suppose demand for a power steering gear assembly is given by Week 1 2 3 5 6. 7 8. 10 Demand | 45 65 35 40 33 32 25 Currently there are 150 parts on hand. Production is planned by using the fixed order period method with p=2. The lead time is three periods. (a) Determine the planned order release schedule. (b) Assume that a schedule receipt for 50 parts is scheduled to arrive in week five. What changes, if any, need to be made to the scheduled receipt? (c) Applying changed scheduled receipt, using the same lot-sizing and lead time, compute the planned order release schedule.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.