bbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work orde ize, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time onsuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one- our lunch break and one-half hour for operator breaks. Setup (Changeover) Time per Work Order Processing Time per Panel (seconds) 2.50 2.22 4.11 Consolidated Work Orders Work Order Quantity 8,800 panels (minutes) 86 Model XVT-5 Case Model UYT-3 Case 8,700 63 Model KLY-6 Case 12,400 135 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. o do this work in 1 day they need machine(s). o do this work in 2 days they need machine(s). To do this work in 3 days they need machine(s).
bbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work orde ize, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time onsuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one- our lunch break and one-half hour for operator breaks. Setup (Changeover) Time per Work Order Processing Time per Panel (seconds) 2.50 2.22 4.11 Consolidated Work Orders Work Order Quantity 8,800 panels (minutes) 86 Model XVT-5 Case Model UYT-3 Case 8,700 63 Model KLY-6 Case 12,400 135 What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place. The total workload is hours. How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number. o do this work in 1 day they need machine(s). o do this work in 2 days they need machine(s). To do this work in 3 days they need machine(s).
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
Related questions
Question
100%
![Abbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order
size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time
consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one-
hour lunch break and one-half hour for operator breaks.
Consolidated
Work Orders
Model XVT-5 Case
Model UYT-3 Case
Model KLY-6 Case
Work Order
Quantity
8,800 panels
8,700
12,400
Setup
(Changeover)
Time per
Work Order
(minutes)
86
63
135
Processing
Time per
Panel
(seconds)
2.50
2.22
4.11
What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place.
The total workload is
hours.
How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number.
To do this work in 1 day they need
machine(s).
To do this work in 2 days they need
machine(s).
To do this work in 3 days they need
machine(s).](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fc00f41a8-3019-411c-9841-b4d3b90602dd%2F776b3452-28d4-42ee-bfd9-0ce8673af870%2Fxbiuaj6_processed.png&w=3840&q=75)
Transcribed Image Text:Abbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order
size, and thereby, make one large production run per model type. Plastic injection molding machines are used to make these parts, and it is time
consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one 10-hour shift with a one-
hour lunch break and one-half hour for operator breaks.
Consolidated
Work Orders
Model XVT-5 Case
Model UYT-3 Case
Model KLY-6 Case
Work Order
Quantity
8,800 panels
8,700
12,400
Setup
(Changeover)
Time per
Work Order
(minutes)
86
63
135
Processing
Time per
Panel
(seconds)
2.50
2.22
4.11
What is the total workload (demand) in hours for this work order mix? Round your answer to one decimal place.
The total workload is
hours.
How many machines will it take to do this work in one, two, or three days? Round your answers up to the nearest whole number.
To do this work in 1 day they need
machine(s).
To do this work in 2 days they need
machine(s).
To do this work in 3 days they need
machine(s).
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,