Drawdown is defined as the difference between the static water level and the dynamic water level at a certain time during pumping. For example, if the static water level is 10m and the dynamic water level after 20minutes is 12m, then the drawdown is (12m-10m) 2m after 20 minutes. Two boreholes (BH1 and BH2) in different areas were pumped. In BH1, the drawdown kept on increasing at about 0.005m per minute, while in BH2, the drawdown kept on increasing at about 5m per minute. BH may be drawing water from an aquitard, while BH may be drawing from an aquifer. BH is likely to have a higher transmissivity and BH is likely to have a cone of depression with a smaller radius. BH is likely to be recommended to supply water to a big community.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Drawdown is defined as the difference
between the static water level and the
dynamic water level at a certain time during
pumping. For example, if the static water
level is 10m and the dynamic water level
after 20minutes is 12m, then the drawdown
is (12m-10m) 2m after 20 minutes.
Two boreholes (BH1 and BH2) in different
areas were pumped. In BH1, the drawdown
kept on increasing at about 0.005m per
minute, while in BH2, the drawdown kept on
increasing at about 5m per minute. BH
may be
drawing water from an aquitard, while
BH
may be
drawing from an aquifer. BH
is likely to
have a higher transmissivity and BH
is likely to
have a cone of depression with a smaller
radius. BH
is likely to be recommended to supply
water to a big community.
Transcribed Image Text:Drawdown is defined as the difference between the static water level and the dynamic water level at a certain time during pumping. For example, if the static water level is 10m and the dynamic water level after 20minutes is 12m, then the drawdown is (12m-10m) 2m after 20 minutes. Two boreholes (BH1 and BH2) in different areas were pumped. In BH1, the drawdown kept on increasing at about 0.005m per minute, while in BH2, the drawdown kept on increasing at about 5m per minute. BH may be drawing water from an aquitard, while BH may be drawing from an aquifer. BH is likely to have a higher transmissivity and BH is likely to have a cone of depression with a smaller radius. BH is likely to be recommended to supply water to a big community.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Water withdrawal
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning