The project manager conducted a time study of the steel bending team with the times given below. The manager gave a performance rating of 115. The allowance factor of 10% can be added for job conditions. Find the standard time for this operation is most nearly: No. Sec. No. Sec. 3.10 3.15 3.05 3.12 3.08 3.05 3 3.10 8. 4 3.08 3.12 5 10 3.10 А. 2.96 В. 3.20 С. 3.56 D. 3.92
Q: The Mama Lit is a restaurant near a project site and it is a direct supplier of food for the nearby…
A: a) Network Diagram
Q: i. What is the project completion date? ii. What is the total cost required for completing this…
A: Total cost is the cost that includes fixed cost and variable cost of goods and services.
Q: Task Task Description Predecessors Time estimate (in minutes) te σ2 to tm tp A Slice the…
A: Drawing a network diagram can help in identifying the critical path and the critical activities…
Q: Q The project charter for a project was approved for planning, and you have just been assigned as…
A: A project charter is a formal, ordinarily short record that portrays your project completely —…
Q: a. What is the length of the critical path? Length of the critical path hours
A: Below is the solution:-
Q: 2. Reduce job 3 by two days. ONo O Yes 3. Reduce job 5 by two days. Yes O No e. What is the…
A: Given Information: Critical Path:- 1-2-5-8-9-11 Expected Completion Time:- 26.5 days
Q: PERT assumes that individual task times can be modeled with what type of prob- ability distribution?
A: PERT assumes that individual task times can be modeled with the beta distribution.
Q: Question 37 How much slack is there in task A? Your Answer: Your Answer Question 38 If the crash…
A: Slack is the available time in a activity for delaying the project without affecting the total…
Q: What is the critical path? By how many weeks are we 90% sure of completing the project (along the…
A: A project network diagram is a graph that shows the sequence in which a project's activities are to…
Q: From a project resource management context, discuss the significance of a Work Breakdown Structure…
A: A work breakdown structure is a project management approach for completing a difficult, multi-step…
Q: predictions regarding Tom's next move
A: Tom Bray was thinking about the present plan for getting work done as he looked across the cove at…
Q: project. She analyzes the tasks involved in making the app and produces the PERT chart umbers…
A: This various paths are the possible ways of making the health app for the company who wants to enter…
Q: Consider the following work breakdown structure: Time Estimates (days) Optimistic Most Likely…
A: Critical path analysis (CPA) is a project managerial technique that represents identifying each…
Q: Based on the activity time estimates, the expected times for each of the activities are (round…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Case: Tom Bray Tom Bray was mulling over today’s work schedule as he looked across the bay at the…
A: Management by Wandering Around (MBWA) is a management style that employs an ad hoc approach and…
Q: What is the role of capacity in the management of projects?
A: It is a system of allocating resources to achieve maximum productivity. It also helps us determine…
Q: 1) Create labor usage profile for the below project; and (2) level the laborer resource throughout…
A: Below is the solution:-
Q: A lively discussion is under way at Sunrise Software, where you are a project manager. The main…
A: There is no specific answer to this question, Paula and Ethan are having wrong concerned about the…
Q: For the project data shown in the table below. Find The expected time to complete 77 % of the…
A: Given data: To find the expected time to complete 77% of the project M=2*O P=3*0 Activity…
Q: d. Determine the probability that the team and the contractor will be in place and the project…
A: Based on the 3-time estimates given, we find the Expected duration and Variance for each activity as…
Q: Why does the project manager do resource leveling?
A: Resource leveling is a resource optimization strategy that determines when a project can be…
Q: The first question: The part of a construction project whose activities are shown in Table No. 1…
A:
Q: How does the Work Breakdown Structure differ from the project network?
A: Work Breakdown structure is the clear breakdown of the entire working processes of the project into…
Q: completion time is 31 weeks. What is the be nuch will it cost? Show your work. Activity Expected…
A: Given: Each company takes 1 week to complete the project. Cost per activity to crash is $200…
Q: A plumber has decided to use the techniques of project management to plan a job. He knew all the…
A: Following ios the network diagram:
Q: b. Work Packages 2. Stipulate your Completion Criteria for 5 of your most important tasks. Note:…
A: Work Breakdown Structure
Q: When Salem Zahri took the green light to start the constructions, he made all necessary arrangements…
A: In the given case is a Salem Zahri took the green light to start the constructions, he made all…
Q: Describe different ways to develop a WBS (Work Breakdown Structure) and explain why it is often so…
A: The Work Breakdown Structure is a method for representing the scope of a project or a product. WBS…
Q: sing PERT, Calculate the expected task duration time for the following task Optimistic Time (O) =…
A: Optimistic Time (O) = 5 Pessimistic Time (P) = 7 Most Likely time (M) = 6
Q: the working of the t
A: The triple constraint theory in project management states that undertaking works inside the limits…
Q: a) Briefly describe what is meant by the term 'Work Breakdown Structure' (WBS), when applied to…
A: CPM stands for Critical Path Method, which was invented by DuPont and first used in the chemical…
Q: days. Carl's team should be able to complete the project in
A: A network diagram is the graphical representation of project activities and shows their duration of…
Q: The VOX Cinema is installing a new system to enhance the quality of movies shown. Several things…
A: Formula:
Q: Name the information contained in the work plan ?
A: A work plan consists of the objectives and processes by carrying out which a team or an individual…
Q: A renovation of the gift shop at Orlando Amway Center has six activities (in hours). For the…
A: Given data is
Q: The possibility of completing the project in less or equal time The critical path plus 2 weeks is 95…
A:
Q: What is the latest start (LS) of activity F ? Choose. Choose. What is the slack (SL) value of…
A: The earliest activity can begin is called Early Start (ES). Only if all of the previous activities…
Q: Use the schedule below to answer these questions. (Assume a 5-day work week, weekends are shown as…
A: Find the Given details below: ID Task name Duration(Days) Included Weekends(Days) Predecessors…
Q: 2. Tom Schriber, a director of personnel of Management Resources, Inc., is in the process of…
A: A Project Evaluation and Review Technique (PERT) is a device that projects the board uses to deal…
Q: For the project data shown in the table below. Find The expected time to complete 77 % of the…
A: The formulas:
Q: 5. H,GF 21 Find total duration to finish the project And find critical oath By AoA method 3:33 PM
A: Activity Immediate Predecessors Duration A - 5 B - 12 C A 7 D C…
Q: 3. The VOX Cinema is installing a new system to enhance the quality of movies shown. Several things…
A: Given data is
Q: All work packages under the scope of work are displayed: Select one: a. In the Work Breakdown…
A: Note- Hi! Thank you for the question As per the honour code, We’ll answer the first question since…
Q: Immediate Estimated Activity Activity Description Predecessors Duration A Excavate 2 weeks B Lay the…
A: Following format used for network diagram: Early Start(ES) Duration Early Finish(EF)= ES+Duration…
Q: 7. Develop a WBS for a project in which you are going to build a bicycle. Try to identify all of the…
A: A Work Breakdown Structure (WBS) is a various leveled framework of the jobs needed to finish a…
Q: VFor the Project data Shown in the table below, Find the expected time to achieve usCASSame that…
A: Given that:
Step by step
Solved in 2 steps
- 9. A work operation consisting of three (3) elements has been subjected to a time study. The recorded observations are shown below. The allowance factor for personal time is 5%, delay is 5%, and fatigue is 10%. Determine the standard time for the work operations. Observation (in Minutes) Element 1 2 456 Rating (%) 0.1 0.3 0.2 0.9 0.2 0.1 0.8 0.6 0.8 0.5 3.2 0.7 0.5 0.5 0.4 0.5 0.6 0.S Job Performance A 90 110 80 10. The preliminary work sample of an operation indicates the following: what is the required sample size for a three (3) sigma with 4% accuracy. No. of times operator working 60 No. of times operator idle 40 11. PJ Sumeguin, Inc. produces telephone system with built in TV screens. Its learning rate is 80%. a. If the first one took 56hrs, how long will it take the company to complete the 11th unit? b. How long will the 1st 11 systems take in total? c. If you are the purchasing agent, you are expected to buy units 12 through 15 of the new phone systems. What would be your…The following are some observations of worker timings for a number of elements that make up a task. The total allowance factor is 15% task OBSERV.1 OBS.2 OBS.3 OBS.4 OBS.5 OBS.6 PERF. RATING A 8 9 10 13 14 12 120% B 3 4 5 4 3 6 85% C 5 6 7 4 5 7 105% D 3 2 1 3 2 2 95% Calculate the average times for each element A, B, C etc. Calculate the normal (basic) time for each job element. Ie. Normal time = (Average observed time) x (Rating) Find the total normal time for the whole task (A+B+C +….) Compute the standard time for the Job. 2. Name 5 advantages of work sampling over time study. 3.What is the difference between design capacity and effective capacity in a production environment?A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Element 1 2 3 4 Performance Rating 95% 90 125 110 1 0.46 1.46 0.81 1.06 Element 1 2 3 4 Click here for the Excel Data File Element 1 2 OBSERVATIONS (minutes per cycle) Average cycle 2 0.51 1.46 0.81 1.11 a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Normal time 3 0.41 1.41 0.71 1.06 4 5 6 0.41 0.41 0.41 1.41 1.41 1.46 0.76 0.81 0.76 1.11 1.11 1.16 b. Find the normal time for each element. (Round your answers to 3 decimal places.)
- 5. 6. O Spreadsheet Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, seven percent; delay, six percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Element A B C D E F Round your answer to two decimal places. minutes Observation. 1 2 3 4 5 6 0.11 0.14 0.08 0.06 0.13 0.11 0.25 0.21 0.23 0.20 0.46 0.50 0.46 0.45 0.47 0.61 0.67 0.65 0.62 0.69 0.73 0.75 0.72 0.70 1.03 1.02 0.98 1.01 1.10 8 7 9 0.15 0.14 0.15 0.24 0.25 0.28 0.26 0.26 0.47 0.50 0.46 0.50 0.70 0.70 0.67 0.70 0.82 0.81 0.77 0.79 0.84 1.11 1.02 1.07 1.10 Performance Rating 110 % 115% 100% 85% Hint(s) Check My Work 100% 95% Hint(s) Check My Work CNine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, eight percent; delay, five percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Observation Element 1 2 3 4 5 6 7 8 9 Performance Rating A 0.09 0.14 0.08 0.07 0.10 0.09 0.15 0.14 0.15 110% B 0.23 0.20 0.22 0.20 0.24 0.23 0.29 0.27 0.27 90% C 0.49 0.51 0.49 0.46 0.49 0.49 0.51 0.49 0.48 95% D 0.64 0.66 0.63 0.62 0.69 0.67 0.67 0.66 0.70 115% E 0.72 0.74 0.74 0.69 0.81 0.82 0.79 0.80 0.82 105% F 1.01 1.03 0.99 0.99 1.09 1.12 1.03 1.07 1.12 85% Round your answer to two decimal places. minutesNine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, five percent; delay, seven percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Observation Element 1 2 3 4 5 6 7 8 9 Performance Rating A 0.11 0.14 0.10 0.09 0.12 0.11 0.15 0.14 0.15 105% B 0.24 0.20 0.21 0.22 0.24 0.23 0.28 0.26 0.26 85% C 0.46 0.48 0.46 0.44 0.48 0.48 0.48 0.46 0.49 100% D 0.64 0.66 0.65 0.59 0.71 0.69 0.69 0.66 0.71 115% E 0.70 0.74 0.74 0.68 0.79 0.83 0.77 0.80 0.84 100% F 1.01 1.05 1.01 1.00 1.09 1.12 1.05 1.06 1.12 95% Round your answer to two decimal places. minutes
- A hotel housekeeper was observed five times on each of four task elements as shown in the table below. On the basis of these observations, find the standard time for the process. Assume a 10% allowance factor. Round off your answer in 2 decimal places.Element Performance rating (%) Observations(Minutes per cycle)1 2 3 4 5Check Minibar 100 1.5 1.6 1.4 1.5 1.5Make one bed 90 2.3 2.5 2.1 2.2 2.4Vacuum floor 120 1.7 1.9 1.9 1.4 1.6Clean Bath 100 3.5 3.6 3.6 3.6 3.2A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element 1 2 3 4 Performance Rating 80% 75 120 105 1 0.51 1.51 0.86 1.11 Click here for the Excel Data File Element 1 2 3 4 Element 1 2 3 4 2 0.56 1.51 0.86 1.16 a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Average cycle 3 0.46 1.46 0.76 1.11 Normal time 4 5 6 0.46 0.46 0.46 1.46 1.46 1.51 0.81 0.81 0.86 1.16 1.16 1.21 b. Find the normal time for each element. (Round your answers to 3 decimal places.)Peter Rourke, a loan processor a t Wentworth Bank,has been timed performing four work elements, with the resultsshown in the fo llowing table. The allowances for tasks such asth is are personal, 7%; fa tigue, 10%; and delay, 3%. a) What is the normal time?b) What is the standard time?
- Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, six percent; delay, six percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Observation Element 1 2 3 4 5 6 7 8 9 Performance Rating A 0.09 0.13 0.06 0.05 0.11 0.09 0.14 0.13 0.14 85% B 0.25 0.18 0.23 0.20 0.24 0.24 0.27 0.26 0.26 115% C 0.47 0.51 0.47 0.46 0.49 0.49 0.51 0.47 0.48 110% D 0.61 0.69 0.65 0.60 0.71 0.67 0.67 0.69 0.73 90% E 0.72 0.76 0.74 0.68 0.79 0.81 0.76 0.80 0.81 115% F 1.02 1.04 0.98 1.02 1.08 1.12 1.04 1.07 1.09 85% Round your answer to two decimal places. minutesLatisha Simmons, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table. Task Element 1 2 3 4 Performance Rating 110% 85% 90% 85% 1 0.6 0.6 0.5 1.4 Observation (minutes per cycle) 2 3 4 0.3 0.8 0.5 1.9 0.6 0.7 0.6 1.9 0.4 0.6 0.5 1.7 The allowances for tasks such as this are personal, 8%; fatigue, 12%; and delay, 3%. minutes (round your response to two a) The normal time for the complete operation : = decimal places). b) The standard time for this process = minutes (round your response to two decimal places). 0.5 0.8 0.5 1.4mk t inces Given these observed times (in minutes) for four elements of a job, determine the observed time (OT) for each element. Note: The second element only occurs every other cycle. (Round your answers to 2 decimal places.) Element 2 3 Element 1 2 3 1 3.1 - 2.1 1.6 4 2 2.6 1.1 Click here for the Excel Data File CYCLE 3 3.1 - 2.1 3.1 2.6 1.6 Observed Time 4 3.1 1.1 2.1 1.6 5 3.1 2.1 1.6 3.1 1.1 2.1 1.6