Compute the profit generated by the estimator, project management, and the excavation crew on the given project.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Hicks Contracting collects and analyzes cost data in order to track the cost of installing decks on new home construction jobs. The following are some of the costs that they incur. Classify these costs as fixed or variable costs and as product or period costs. A. Lumber used to construct decks ($12.00 per square foot) B. Carpenter labor used to construct decks ($10 per hour) C. Construction supervisor salary ($45,000 per year) D. Depreciation on tools and equipment ($6,000 per year) E. Selling and administrative expenses ($35,000 per year) F. Rent on corporate office space ($34,000 per year) G. Nails, glue, and other materials required to construct deck (varies per job)
4. Hicks Contracting collects and analyzes cost data in order to track the cost of installing decks on new home construction jobs. The following are some of the costs that they incur. Classify these costs as fixed or variable costs and as product or period costs.
Costs
Variable / Fixed
Product / Period
Lumber used to construct decks ($12.00 per square foot)
Carpenter labor used to construct decks ($10 per hour)
Construction supervisor salary ($45,000 per year)
Depreciation on tools and equipment ($6,000 per year)
Selling and administrative expenses ($35,000 per year)
Rent on corporate office space ($34,000 per year)
Nails, glue, and other materials required to construct deck (varies per job)
Patterson Lawn Co. wants to determine the cost of each lawn care maintenance job. The Company has two operating departments, one that performs lawn care services for commercial properties and one that services residential properties. Both operating departments are supported by two service departments, administrative and machine maintenance. Costs for each of these supporting departments are as follows:
Administrative
Machine Maintenance
Total cost
$576,000
$3,825,000
The following estimates that are related to the operating departments is as follows:
Commercial
Residential
Total
properties
properties
# of employees
68
60
128
# of customers
225
260
485
# of billable hours
23,000
22,000
45,000
Total overhead cost*
$
525,000
$
450,000
$
975,000
*Note that total overhead cost includes costs allocated from service departments and other overhead costs.
The Company uses the…
Chapter 11 Solutions
Construction Accounting And Financial Management (4th Edition)
Ch. 11 - How can the estimator increase the profit the...Ch. 11 - Prob. 2DQCh. 11 - What are the six ways to allocate overhead to...Ch. 11 - Why is it important for profit center managers to...Ch. 11 - Prob. 5DQCh. 11 - What are the three ways that job-based profit...Ch. 11 - Prob. 7DQCh. 11 - In Figure 2-8, why was equipment repairs and...Ch. 11 - Your company completed the site work for the South...Ch. 11 - Prob. 10P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Hicks Contracting collects and analyzes cost data in order to track the cost of installing decks on new home construction jobs. The following are some of the costs that they incur. Classify these costs as fixed or variable costs and as product or period costs. Lumber used to construct decks ($12.00 per square foot) Carpenter labor used to construct decks ($10 per hour) Construction supervisor salary ($45,000 per year) Depreciation on tools and equipment ($6,000 per year) Selling and administrative expenses ($35,000 per year) Rent on corporate office space ($34,000 per year) Nails, glue, and other materials required to construct deck (varies per job)arrow_forwardIn connection with surfacing a new highway, a contractor has a choice of two sites on which to set up the asphalt-mixing plant equipment. The contractor estimates that it will cost $2.75 per cubic yard mile (yd3-mile) to haul the asphalt-paving material from the mixing plant to the job location. Factors relating to the two mixing sites are as follows given in the shown table (production costs at each site are the same): The job requires 50,000 cubic yards of mixed-asphalt-paving material. It is estimated that four months (17 weeks of five working days per week) will be required for the job. Compare the two sites in terms of their fixed, variable, and total costs. Assume that the cost of the return trip is negligible. Which is the better site? For the selected site, how many cubic yards of paving material does the contractor have to deliver before starting to make a profit if paid $12 per cubic yard delivered to the job location?arrow_forwardAbagail Corp. uses activity-based costing system with three activity cost pools. The following information is provided: Costs: Wages and salaries $204,000 Depreciation 114,000 Utilities 116,000 Activity Cost Pools Assembly Setting Up Other Wages and Salaries 0.58 30% 10% Depreciation 0.39 45% 20% Utilities 0.24 40% 30% How much total cost would be allocated to the Assembly activity cost pool?arrow_forward
- A heavy construction firm has been awarded a contract to build a large concrete dam. It is expected that a total of 8 years will be required to complete the work. The firm will buy $600,000 worth of special equipment for the job. During the preparation of the job cost estimate, the following utilization schedule was computed for the special equipment:arrow_forwardBob Randall, cost accounting manager for Hemple Products, was asked to determine the costs of the activities performed within the company’s Manufacturing Engineering Department. The department has the following activities: creating bills of materials (BOMs), studying manufacturing capabilities, improving manufacturing process, training, employees, and designing tools. The resources costs (from the general ledger) and the times to perform one unit of each activity are provided below: Resource Cost Activities Unit Time Driver Salaries $500,000 Creating BOMs 0.5 hr. No. of BOMs Equipment 100,000 Designing Tools 5.4 hr. No. of tools designs Supplies 30,000 Improving processes 1.0 hr. Process improvement hrs Total $630,000 Training employees 2.0 hr. No. of training sessions Studying capabilities 1.0 hr. Study hrs. Total machine and labor hours (at practical capacity):…arrow_forwardDavidson Engine Repairs provides maintenance and repair services for small engines such as those found in lawn mowers, power saws, and snow throwers. The repair shop costs include the salaries for the mechanics, insurance and depreciation on the repair equipment, materials and parts used for the jobs, and utilities. The repair shop manager would like to develop a model for predicting repair costs and over the past 10 months has carefully recorded the total repair costs incurred, along with the number of maintenance and repair jobs completed each month. The data are shown below: Month January February March 250 246 313 278 217 193 September 163 October 116 April May June July August Jobs Repair Costs $36,610 242 284 $41,395 Y = $37,950 $36,840 $44,340 $40,120 $33,660 $28,990 $25,275 $18,730 Required: 1. Not available in Connect. 2. Using the high-low method, estimate a cost formula for repair costs. Express the formula in the form Y = a + bX. Xarrow_forward
- 15. When producing tables, a company incurs the following costs: $30 for screws, $6,500 for wood, $80 for wood stain, $5,000 paid to janitors who clean the production facilities, $2,100 paid to employees who saw and prepare wood for production, and $1,600 for depreciation on equipment. How much factory overhead cost would need to be allocated to the tables produced?arrow_forwardRundle Construction Company expects to build three new homes during a specific accounting period. The estimated direct materials and labor costs are as follows. Expected Direct labor Home 1: $63,000 Home 2: $108,000, Home 3: $181,000 Direct materials Home 1: 98,000 Home 2: 143,000 Home 3: 186,000 Assume Rundle needs to allocate two major overhead costs ($ 52,800 of employee fringe benefits and $12,,810 of indirect materials cost) among the three Jobs. required; Choose an appropriate cost driver for each of the overhead costs and determine the cost of each house ( round " allocation rate to 2 decimal places.)arrow_forwardBob Randall, cost accounting manager for Hemple Products, was asked to determine the costs of the activities performed within the company's Manufacturing Engineering Department. The department has the following activities: creating bills of materials (BOMs), studying manufacturing capabilities, improving manufacturing processes, training employees, and designing tools. The resource costs (from the general ledger) and the times to perform one unit of each activity are provided below. Resource Costs Activities Unit Time Driver Salaries $425,000 Creating BOMs 0.6 hr. No. of BOMs Equipment 92,000 Designing tools 3.7 hrs. No. of tool designs Supplies 43,000 Improving processes 1.1 hrs. Process improvement hrs. Total $560,000 Training employees 2.1 hrs. No. of training sessions Studying capabilities 2.1 hrs. Study hours Total machine and labor hours (at practical capacity): Machine…arrow_forward
- Using ABC in a service company Blanchette Plant Service completed a special landscaping job for Kerry Company. Blanchette uses ABC and has the following predetermined overhead allocation rates: The Kerry job included $750 in plants; $1,300 in direct labor; one design; and 30 plants. Requirements What is the total cost of the Kerry job? If Kerry paid $3,540 for the job, what is the operating income or loss? If Blanchette desires an operating income of 30% of cost, how much should the company charge for the Kerry job?arrow_forwardI need help solving the following problem. Elizabeth Flanigan and Associates is an engineering and design firm that specializes in developing plans for recycling plants for municipalities. The firm uses a job costing system to accumlate the cost associated with each design project. Flanigan employs three levels of employee: senior engineers, associate engineers, and clerical staff. The salary cost of the clerical staff is included in overhead, along with the cost of engineering supplies, automobile travel, and equipment depreciation. The cost of airline travel, motels, building permits, and fees from other consultants is charged to each project as direct materials. Overhead is applied to projects using a predetermined overhead rate based on total engineering hours. The rate for 20X0 is $5 per hour. The six different salary levels for 20X1 for the employees of Elizabeth Flanigan and Associates are listed below. The hourly rate is determined by dividing the yearly salary by 2,000…arrow_forwardJohn Company has two service departments, Maintenance and Human Resources. John Company also has two production departments, Mixing and Finishing. Maintenance costs are allocated based on square footage while Human Resources costs are allocated based on number of employees. The information given below has been gathered for the current year. If the direct method is used to allocate service department costs, then the total cost of the Mixing Department after allocation would be Human Resources Maintenance $126,000 800 8. Mixing S105,000 1,600 24 Finishing $175,000 1,200 32 Direct costs $84,000 Square footage Number of employees 400 12 $108,000 O $213,000 O $199,500 O $36,000 $105,000arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeSurvey of Accounting (Accounting I)AccountingISBN:9781305961883Author:Carl WarrenPublisher:Cengage Learning
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Survey of Accounting (Accounting I)
Accounting
ISBN:9781305961883
Author:Carl Warren
Publisher:Cengage Learning