Industrial Motor Control
7th Edition
ISBN: 9781133691808
Author: Stephen Herman
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 54, Problem 5RQ
To determine
The number that is set on a timer to be programmed for the delay of 3 minutes.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Name
Section 5-2: Line Diagrams-Signals,
Decisions, and Actions
In the following application, a temperature switch controls a heating contactor and a flow switch is used to
ensure there is enough air flow. If there is not enough air flow, an alarm is sounded. Complete the required
information.
1. List all the signal devices in the circuit.
2. List all the action devices in the circuit.
3. List the decision part of the circuit that automatically sounds the alarm if there is a problem.
4. When the heating element is on during normal operation, is the flow switch open or closed?
CIRCULATING
2
L1
FAN
TEMPERATURE
SWITCH
TR
HEATING
ELEMENTS
FLOW
SWITCH
-HOT AIR
PADDLE
AIR FILTER
NORMALLY CLOSED
FLOW SWITCH
65
ALARM
(SOUNDS IF NO FLOW FOR
15 SECONDS OR MORE)
Date
HEATING
CONTACTOR
TR
ON-DELAY
TIMER
SUPPLY AIR
COLD AIR
(3) TIME SET= 15 SEC
© 2014 American Technical Publishers, Inc.
All rights reserved
Build a ladder logic diagram showing the timer delays.
QUESTION 27
Pneumatic timers have better repeat accuracy that electronic timers.
True
False
Chapter 54 Solutions
Industrial Motor Control
Ch. 54 - Why are NEMA symbols representing such components...Ch. 54 - Explain how to program an internal relay into the...Ch. 54 - Why are the contacts used to represent stop...Ch. 54 - Why is the output I/O used to energize a motor...Ch. 54 - Prob. 5RQCh. 54 - When programming in Boolean, what command is used...Ch. 54 - When programming in Boolean, what command is used...Ch. 54 - When programming in Boolean, what command is used...Ch. 54 - Why are the numbers 8 and 9 not used in an OCTAL-...
Knowledge Booster
Similar questions
- The control system employs microcontroller to control the variables then it is called as direct digital control system. Select one: True Falsearrow_forwardsub: numerical method value A= 7 value L= 27arrow_forwardRefer to the circuit shown in Figure 25–5. Assume that timer TR1 is set for a delay of 10 seconds and timer TR2 is set for a delay of 5 seconds. When the START button is pressed, the motor starts. After 10 seconds the S1 contacts open and the motor continues to accelerate, but never reaches full speed. After a delay of about 30 seconds, the motor trips out on overload. Which of the following could cause this problem? TR1 coil is open. S2 coil is open. S1 coil is open. R coil is open.arrow_forward
- A kid is plating on a swing and it takes approximately 2 seconds to reach on side coming from the other. What is the period in seconds?arrow_forwardIn relation to the circuit presented below, mark the alternative(s) that you consider correct. 1 To enable actuator A2 to advance, it is necessary to switch valve V2 to the leftmost position and ensure that valve V1 is in its initial (intermediate) position. 2 Switching valve V2 to the leftmost position allows actuator A2 to advance, but for this to happen, valve V1 must also be switched to the leftmost position. 3 When activating valve V1, using the locking lever installed on the left side of it, the two actuators (A1 and A2) are allowed to advance. 4 Hydraulic pump B1 is a simple variable displacement type. 5 Valves V1 and V2 have a TANDEM center.arrow_forwardBased on the timing diagram below, choose the correct statement regarding Timer Relay. On Coil Power ff + 5 → Seconds Closed Contact Status Open Time Select one or more: O a. This is the OFF-Delay Relay O b. This is the ON-Delay Relay O c. The relay can used in automatic gate at car parking application :- when sensor detect car already pass by to parking area, motor to control gate closing will turn ON after a few minutes. O d. When the coil energized, the relay contact will make connection at the same timing.arrow_forward
- An emergency stop system is to be designed for a certain automatic production machine. A single “start” button is used to turn on the power to the machine at the beginning of the day. In addition, there are two “stop” buttons located at two locations on the machine, either of which can be pressed to immediately turn off power to the machine. Let X1 = start button (normally open), X2 = stop button 1 (normally closed), X3 = stop button 2 (normally closed), and Y = power-to-machine. (a) Construct the truth table for this system. (b) Write the Boolean logic expression for the system. (c) Construct the ladder logic diagram for the systemarrow_forwardNUMERICAL METHOD PLEASE FOLLOW THE INSTRUCTIONarrow_forwardIndustry Print Exercise 23-2 Refer to print PR 23-2. The sequence of operations for this print is given below. Answer the questions following the sequence of operations. Sequence of Operations descends at a controlled rate, slowly compacting the explosive charge to avoid detonation due to a sudden Description: This is a system to control a 90-ton hydraulic, explosive-compaction press. The press ram shock. 1. The cycle is started by energizing solenoid A, which shifts control valve 3 and supplies pressure to the head end of the hydraulic cylinder (7). This operates the ram. 2. The cylinder (7) extends at a slow rate controlled by the fluid in the rod end of the cylinder, which is vented through the flow control valve (5). the 1. When de-energizes solenoid A and energizes solenoid B. This shifts control valve 3 to retract the cylinder (7). de rol valve 5 has an integral check valve that permits the free flow of fluid in the opposite direction, causing the cylinder (7) to rapidly retra…arrow_forward
- While constructing a building, an engineer need to fix two steel beams together using a bracket as shown in Figure 1. Using absolute coordinate system, construct a G-code program for drilling hole number 2 only. To remove the metal chips the hole should be done in two equal steps. During the drilling, coolant should be on after spindle starts and stop before spindle stops. The spindle speed set to 1750 RPM. Drilling bit in rack number 2 and it should be 2 mm over the work piece. Drilling feed rate is 25 mm/min. Explain each code used in the program in a column. 57.5- 12.5 Hole (4) Hole (3) 30 10 Hole (2) Hole (1) X0 YO ZO 10 15 All dimensions shown are in mm Figure 1arrow_forward17- The memory unit of PLC is used to write the program to control output device. Select one: True Falsearrow_forwardIs timer TR an on-delay or off-delay timer?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding Motor ControlsMechanical EngineeringISBN:9781337798686Author:Stephen L. HermanPublisher:Delmar Cengage LearningPrecision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning
Understanding Motor Controls
Mechanical Engineering
ISBN:9781337798686
Author:Stephen L. Herman
Publisher:Delmar Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning