Check which variable(s) should be in your answer.Milling constraint 0 =WRONG    Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Shaping constraint 0=WRONG   Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Frame constraint 0=WRONG Enter inequalities using less than (<), greater than (>),

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
A linear programming computer package is needed.
Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.
Component Manufacturing Cost Purchase Cost
Frame $39.00 $52.00
Support $12.50 $16.00
Strap $7.50 $8.50
Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows.
Component Department
Cutting Milling Shaping
Frame 3.5 2.2 3.1
Support 1.3 1.7 2.6
Strap 0.8 1.7
Capacity (hours) 350 420 680
(a)
Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.)
Min 
39FM+52FP+12.5SM+16SP+7.5TM+8.5TP
 
Cutting constraint
21000≤21000 =WRONG
 
 
 
Check which variable(s) should be in your answer.Milling constraint
0 =WRONG
  
Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Shaping constraint
0=WRONG
 
Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Frame constraint
0=WRONG
Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Support constraint
0=WRONG
 
Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).Strap constraint
5500=WRONG

Enter inequalities using less than (<), greater than (>), less than or equal (≤), or greater than or equal (≥).
FM, FP, SM, SP, TM, TP ≥ 0 
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 4 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,