Textbook Question
Chapter 41, Problem 18RQ
Why does a factory need operations sheets?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are
independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
2.1 units/hr
Sawing
7 units/hr
Sanding
Drilling
6 units/hr
Welding
2.5 units/hr
a) Sawing is the bottleneck.
b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places).
c) The throughput time of the overall system is minutes (round your response to two decimal places).
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
7. What is the difference between a basic process and a secondary process? 8. What is a route sheet?
Question 29
In the following layout material moves continuously and uniformly through a series of workstations until the product is completed.
Select one:
O a. Work layout
O b. Job layout
O C. Product Layout
O d. Cell layout
hp
Chapter 41 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 41 - What are the major functional elements or...Ch. 41 - Here are some questions about the route sheet:...Ch. 41 - What is a process flow chart? How is it related to...Ch. 41 - Prob. 4RQCh. 41 - Prob. 5RQCh. 41 - What is MRP and how is it related (tied to) the...Ch. 41 - Prob. 7RQCh. 41 - Prob. 8RQCh. 41 - Prob. 9RQCh. 41 - Prob. 10RQ
Ch. 41 - Prob. 11RQCh. 41 - Prob. 12RQCh. 41 - Suppose that the part in Figure 41.6 was to be...Ch. 41 - Construct a route sheet and an operations sheet...Ch. 41 - Prob. 15RQCh. 41 - Prob. 16RQCh. 41 - Prob. 17RQCh. 41 - Why does a factory need operations sheets?Ch. 41 - Prob. 19RQCh. 41 - Prob. 20RQCh. 41 - Prob. 21RQCh. 41 - The classic manufacturing systems are controlled...Ch. 41 - Compare your college or university to a...Ch. 41 - Prob. 3P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- ASSIGNMENT-2 Tool Box Objective: To perform cutting and forming processes on a sheet metal to produce a tool box with SIZE of 445mmL x 281mmW x 220mmH, with handle holes diameter 20mm. Note : assume any missing dimensions a) List the tools used b) Write the steps to preapare c) Sketch each stepsarrow_forwardI need help with part a b and c in question 2. Question one is listed because it is referenced in question 2. Any help with question 2 would be appreciated even if it is not all 3 parts. thank you 1. A certain batch of parts is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. Batch size is 200 and the average nonoperation time per machine is15 hr. Determine (a) manufacturing lead time and (b) hourly production rate for operation 4.Machine 1 2 3 4 5 6Setup time (hr) 5 3 6 4 5 3Operation time (min) 3.0 3.3 8.2 3.9 4.5 2.3 a. 6(4.3+200(3.9/60)+15) = 193.8 hours 24.2 days if 8 hour shiftb. 4(60)+200(3.9)/200 =5.1 hourly production for operation 4 2. Suppose the part in the previous problem is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations is 30 sec. total time required to…arrow_forwardprocesses in seriesarrow_forward
- Pls do it by steps and have procedure. Thankyouarrow_forwardManufacturing Fill in the blanksarrow_forwardIn which of the following layout type raw materials are fed into the first machine and finished products come out of the last machine? Select one: O a. Process layout O b. Cellular layout O c. Fixed position layout O d. Product layoutarrow_forward
- A company designs and builds cruise ships for the luxury market. Which process type does it apply? O Mass O Jobbing Batch Projectarrow_forwardWhat is difference between assembly plant compared to more typical auto assembly plants?- Why do you think there are no robots or other automation needed in the plant to do the production?arrow_forwardDifferentiate between Assembly Drawing and Assembly Chart?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
Quality Control and Quality Assurance; Author: AISC Education;https://www.youtube.com/watch?v=C2PFj9YZ_mw;License: Standard Youtube License