Degarmo's Materials And Processes In Manufacturing
13th Edition
ISBN: 9781119492825
Author: Black, J. Temple, Kohser, Ronald A., Author.
Publisher: Wiley,
expand_more
expand_more
format_list_bulleted
Question
Chapter 41, Problem 20RQ
To determine
The cost usually included in the overhead cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A company uses various machines in the preparation of ice cream. The firm has been successful until recently when it noticed growing repair expenses for the various machines it uses. Over the past 20 months, the machines have broken down at the rate indicated in the following table:
Each time a machine breaksdown, the company estimates that it loses an average of US$300 in production time and service expenses. Should the company opt to purchase a service contract for preventive maintenance by Angeles Machineries Inc., (AMI) there will still be breakdowns, averaging one breakdown per month. The price for this service by AMI is US$150 per month.
a. If the company continues as is, what is the expected no. of breakdowns based on past history?
b. What will be the cost of breakdowns per month to the company without a preventive maintenance contract?
c. What will be the cost of breakdowns per month to the company with a preventive maintenance contract?
d. Should they engage the…
: The output of a certain machine can be increased if it undergoes a major overhaul now and it will
result additional cash flow of $ 20,000 at the end of each year for “N” years. If i = 15 % per year,
how much can we afford to invest to overhaul this machine?
Formulate a linear program for this problem.
1)
A clothing factory can make three shoe types: A,B, and C. Their profits per shoe are, respectively,
$5, $4, and $3. Type A shoes require 4 pieces of leather, and 1 piece of cloth; type B shoes require
3 pieces of leather, and 2 pieces of cloth; type C shoes require 5 pieces of cloth. The factory
has 10,000 pieces of leather and 50,000 pieces of cloth available. Furthermore, the factory must
produce at least 500 units of each type of shoe.
Chapter 41 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 41 - What are the major functional elements or...Ch. 41 - Here are some questions about the route sheet:...Ch. 41 - What is a process flow chart? How is it related to...Ch. 41 - Prob. 4RQCh. 41 - Prob. 5RQCh. 41 - What is MRP and how is it related (tied to) the...Ch. 41 - Prob. 7RQCh. 41 - Prob. 8RQCh. 41 - Prob. 9RQCh. 41 - Prob. 10RQ
Ch. 41 - Prob. 11RQCh. 41 - Prob. 12RQCh. 41 - Suppose that the part in Figure 41.6 was to be...Ch. 41 - Construct a route sheet and an operations sheet...Ch. 41 - Prob. 15RQCh. 41 - Prob. 16RQCh. 41 - Prob. 17RQCh. 41 - Why does a factory need operations sheets?Ch. 41 - Prob. 19RQCh. 41 - Prob. 20RQCh. 41 - Prob. 21RQCh. 41 - The classic manufacturing systems are controlled...Ch. 41 - Compare your college or university to a...Ch. 41 - Prob. 3P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- B: Iraq Glass Industries Company produces two types of products, A and B, each one goes through two production stages. Product A needs 1 working hour in the first phase, and 4 working hours in the second phase, while Product B needs 2 working hours in the first phase, and 3 hours of work in the second stage. If you know that the profit per unit of product A is $60, and the profit per unit of product B is $50. The available weekly working hours in the first stage are 40 hours, and in the second stage are 120 hours. Required: Building a mathematical model that maximizes the company's profitsarrow_forwardthe final answer is 0.5 A production machine operates in a semi-automatic cycle but a worker must attend the machine 100% of the time to load parts. Unloading is accomplished automatically. The worker's cost rate = 37$/hr including applicable labor overhead rate. To produce the parts, the production machine was bought six years ago for installed price of $750,000. At that time it was anticipated that the machine would last 8 years and be used 5000 hours per year. However, it is now in need of major repairs that will cost $166,500. These repairs will be made and as a result, the machine will last three years, operating 4000 hours per year. Applicable overhead rate for the machine = 42%. Cost of the starting parts = 0.12$/pc. The job runs several months so the effect of setup can be ignored. Each cycle, the actual process time = 26s, and time to load the part = 18 s. Automatic unloading takes 4 s. A proposal has been made to install an automatic parts-loading device on the machine. The…arrow_forwardSuppose that a company needs 1,600,000 items during a year and that preparation for each production run costs $500. Suppose also that it costs $23 to produce each item and $4 per year to store an item. Use the inventory cost model to find the number of items in each production run so that the total costs of production and storage are minimized.arrow_forward
- A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. Element Te (min) Immediate predecessors 1 1.0 2 0.5 3 0.8 1,2 4 0.3 5 1.2 3 0.2 3,4 7 0.5 4 8 1.5 5,6,7 The demand rate for this job is 1600 units/week (assume 40 h/week) and the current number of operators required to meet this demand is eight using the individual manual workers. a) Construct the precedence diagram from the data provided on work elements. b) Use the (i) Kilbridge and Wester rule and (ii) ranked positional weights method to assign work elements to stations, respectively. c) What is the balance delay for the solutions? d) The initial cost to install the assembly line is $2,000,000. If the hourly rate for workers is $50.00/h, will the assembly line be justified using a 3-year service life? Assume 50 weeks/yr. Use a rate of return of 10%. 2.arrow_forwardIf an X-bar chart graph falls below the LCL or rises above the UCL, a machining process is said to be _________.arrow_forwardA factory has five work cells that run five days a week, eight hours a day, making 160 available hours available per work cell. They spend 15 minutes at the start of each day discussing the productions schedule, quality, and other administrative matters and workers take two 15-minute breaks during the day. The company experiences 81 hours of breakdowns, 72 hours of setup, 65 hours of idling, 11 hours of stoppages, spends 20 hours on rework, and spends 23 hours making defects. What is the OEE of the factory?arrow_forward
- 4) A factory manufactures chairs, tables and bookcases each requiring the use of three operations: Cutting, Assembly, and Finishing. The first operation can be used at most 600 hours; the second at most 500 hours; and the third at most 300 hours. A chair requires 1 hour of cutting, 1 hour of assembly, and 1 hour of finishing; a table needs 1 hour of cutting, 2 hours of assembly, and 1 hour of finishing; and a bookcase requires 3 hours of cutting, 1 hour of assembly, and 1 hour of finishing. If the profit is $20 per unit for a chair, $30 for a table, and $25 for a bookcase, how many units of each should be manufactured to maximize profit?arrow_forwardA manufacturer has the following data regarding a product: Fixed cost per month = Rs. 50000 Variable cost per unit = Rs. 200 Selling price Per unit = Rs. 300 Production capacity = 1500 units per month If the production is carried out at 80% of the rated capacity, then the monthly profit (in Rs.) isarrow_forwardThe from-to chart below indicates the number of loads moved per 8-hr day (above the slash) and the distances in ft (below the slash) between departments in a particular factory. Fork lift trucks are used to transport the materials. They move at an average speed = 275 ft>min (loaded) and 350 ft/min (empty). Load handling time (loading plus unloading) per delivery is 1.5 min and anticipated traffic factor = 0.9. Availability = 95% and worker efficiency = 110%. Determine the number of trucks required under each of the following assumptions: (a) the trucks never travel empty; and (b) the trucks travel empty a distance equal to their loaded distance.arrow_forward
- Consider the following tasks that must be assigned to four workers on a conveyor-paced assembly line (i.e., a machine-paced line flow). Each worker must perform at least one task. There exists unlimited demand unless stated otherwise. Time to Complete Task (seconds): Task 1: 30 Task 2: 25 Task 3: 15 Task 4: 20 Task 5: 15 Task 6: 20 Task 7: 50 Task 8: 15 Task 9: 20 Task 10: 25 Task 11: 15 Task 12: 20 The current conveyor-paced assembly-line configuration assigns the workers in the following way: • Worker 1: Tasks 1, 2, 3 • Worker 2: Tasks 4, 5, 6 • Worker 3: Tasks 7, 8, 9 • Worker 4: Tasks 10, 11, 12 What is the capacity of the current line (in units per hour)?arrow_forward1. A certain batch of parts is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. Batch size is 200 and the average nonoperation time per machine is15 hr. Determine (a) manufacturing lead time and (b) hourly production rate for operation 4.Machine 1 2 3 4 5 6Setup time (hr) 5 3 6 4 5 3Operation time (min) 3.0 3.3 8.2 3.9 4.5 2.3 a. 6(4.3+200(3.9/60)+15) = 193.8 hours 24.2 days if 8 hour shiftb. 4(60)+200(3.9)/200 =5.1 hourly production for operation 4 2. Suppose the part in the previous problem is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations is 30 sec. total time required to setup the entire line is 102 hr. Assume that the operation times at the individual machines remain the same as in the previous problem, Determine (a) manufacturing lead time for a part coming off the line,…arrow_forwardA total of 15-day data was collected for a work sampling study at a mechanized production line which involves 10 workers. Each day, the line was operating for 12 hours. The summary of the observations is shown in Table 1. Currently the average monthly salary is RM 1800 per worker. The normal operation period is 22 days per month. Analyse the given information and propose appropriate standard time for the product by applying the industrial engineering approach. Then use the standard time to compute the labour cost (in RM per unit) for the overall production process. (а) Table 1: Work sampling data Item Data Production in progress observations 330 Production is stopped due to various reasons observations 200 Total output over 15 days study 4050 units Factory rating during the study Time study allowance 88% 16% Target production output improvement for next 10% yeararrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Precision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Quality Control and Quality Assurance; Author: AISC Education;https://www.youtube.com/watch?v=C2PFj9YZ_mw;License: Standard Youtube License