Chapter 12, Problem 1.1Q
Summary Introduction
Interpretation: Ending inventory for month 3
Concept Introduction: Inventory is the total goods or stock kept by organizations for resale. It is usually kept to meet uncertain demand. The holding of inventory incurs cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What term refers to a schedule that pulls material into final assembly at a constant rate?
Which type of lift truck is suitable for double deep rack storage - Counterbalance lift truck, Reach/double-reach lift truck, or Turret Truck?
Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that
he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip:
Setup labor cost
Annual holding cost
Daily production
Annual demand
Desired lot size
To obtain the desired lot size, the set-up time that should be achieved =
$25 per hour
$15 per unit
960 units/8 hour day
30,000 (250 days each x daily demand of 120 units)
120 units (one hour of production)
minutes (round your response to two decimal places).
Chapter 12 Solutions
Practical Operations Management
Ch. 12 - Prob. 1DQCh. 12 - Prob. 2DQCh. 12 - Prob. 3DQCh. 12 - Prob. 4DQCh. 12 - Prob. 5DQCh. 12 - Prob. 6DQCh. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - Prob. 3PCh. 12 - Prob. 4P
Ch. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Prob. 10PCh. 12 - Prob. 11PCh. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - Prob. 23PCh. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26PCh. 12 - Prob. 27PCh. 12 - Prob. 1.1QCh. 12 - Prob. 1.2QCh. 12 - Prob. 1.3QCh. 12 - Prob. 1.4QCh. 12 - Prob. 2.1QCh. 12 - Prob. 2.2QCh. 12 - Prob. 2.3QCh. 12 - Prob. 3.1QCh. 12 - Prob. 3.2QCh. 12 - Prob. 3.3Q
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Jitsmart is a retailer of plastic action-figure toys. The action figures are purchased from Tacky Toys, Inc., and arrive in boxes of 20. Full boxes are stored on high shelves out of reach of customers. A small inventory is maintained on child-level shelves. Depletion of the lower-shelf inventory signals the need to take down a box of action figures to replenish the inventory. A reorder card is then removed from the box and sent to Tacky Toys to authorize replenishment of a container of action figures. The average demand rate for a popular action figure, Agent 99, is 18 units per day. The total lead time (waiting plus processing) is 2 days. Jitsmart's safety stocky policy variable, a, is 0.05. What is the authorized stock level for Jitsmart? units. (Enter your response rounded to the nearest whole number.)arrow_forwardJitsmsmart is a retailer of plastic action-figure toys. The action figures are purchased from Tacky Toys, Inc. and arrive in boxes of 48. Full boxes are stored on high shelves out of reach of customers. A small inventory is maintained on child-levels shelves. Depletion of the lower-shelf inventory signals the need to take down a box of action figures to replenish the inventory. A reorder card is then removed from the box and sent to Tacky Toys to authorize the replenishment of a container of action figures. The average demand rate for popular action figure, Agent 99, is 36 units per day. The total lead time (waiting plus processing) is 11 days. Jitsmart's safety stocky policy variables 0.25. What is the authorized stock level for Jitsmart?arrow_forwardFlores Manufacturing, Inc., is moving to kanbans to support its electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost subassembly Daily production Annual usage Lead time Safety stock $23 $200 per subassembly 550 subassemblies 50,000 (= 50 weeks x 5 days each x daily usage of 200 subassemblies) 3 days 1 day's production of subassemblies The kanban size is (round your response to the nearest whole number). The number of kanbans is (round your response to the nearest whole number).arrow_forward
- Jitsmart is a retailer of plastic action-figure toys. The action figures are purchased from Tacky Toys, Inc., and arrive in boxes of 48. Full boxes are stored on high shelves out of reach of customers. A small inventory is maintained on child-level shelves. Depletion of the lower-shelf inventory signals the need to take down a box of action figures to replenish the inventory. A reorder card is then removed from the box and sent to Tacky Toys to authorize replenishment of a container of action figures. The average demand rate for a popular action figure, Agent 99, is 36 units per day. The total lead time (waiting plus processing) is 11 days. Jitsmart’s safety stocky policy variable, a, is 0.25. What is the authorized stock levelfor Jitsmart?arrow_forwardIE Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory tumover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip Setup labor cost Annual holding cost Daily production Annual demand Desired lot size To obtain the desired lot size, the set-up time that should be achieved $25 per hour $13 per unit 992 units/8 hour day 33.000 (275 days each daily demand of 120 units) 124 units (one hour of production) minutes pound your response to two decimal places)arrow_forwardA U.S. Postal Service supervisor is looking for ways to reduce stress in the sorting department. With the existing arrangement, stamped letters are machine-canceled and loaded into tubs with 375 letters per tub. The tubs are then pushed to postal clerks, who read and key zip codes into an automated sorting machine at the rate of 1 tub per 375 seconds. To overcome the stress caused when the stamp canceling machine outpaces the sorting clerks, a pull system is proposed. When the clerks are ready to process another tub of mail, they will pull the tub from the canceling machine area. How many tubs should circulate between the sorting clerks and the canceling machine if 90,000 letters are to be sorted during an 8-hour shift, the safety stock policy variable, α, is 0.18, and the average waiting time plus materials handling time is 25 minutes per tub?arrow_forward
- In a large microelectronics plant, the assembly cell for circuitboards has a demand for 200 units an hour. Two feeder cellssupply parts A and B to the assembly cell (one A and one Bfor each board). Standard containers that look like dividedtrays are used. A container will hold 20 As or 10 Bs. It takes10 minutes to fill up a container with As and 20 minutes tofill up a container with Bs. Transit time to the assembly cell is5 minutes for both A and B. No safety factor is used. Set up akanban control system for the assembly process.arrow_forwardAssume that a plant operates 2,000 hours per year and the demand rate for parts is 100,000 units per year. The circulation time for each kanban container is 24 hours. How many kanban containers are needed for a container size of 100 parts? What would be the effect of reducing the container size to 60 parts What is the takt time for this process? What takt time is needed for 80,000 units per year?arrow_forwardA U.S. Postal Service supervisor is looking for ways to reduce stress in the sorting department. With the existing arrangement, stamped letters are machine-canceled and loaded into tubs with 450 letters per tub. The tubs are then pushed to postal clerks, who read and key zip codes into an automated sorting machine at the rate of one tub per 385 seconds. To overcome the stress caused when the stamp canceling machine outpaces the sorting clerks, a pull system is proposed. When the clerks are ready to process another tub of mail, they will pull the tub from the canceling machine area. How many tubs should circulate between the sorting clerks and the canceling machine if 95,000 letters are to be sorted during a 10-hour shift, the safety stock policy variable, α, is 0.25, and the average waiting time plus material handling time is 30 minutes per tub? The average processing time per tub of letters, p, is nothing day. (Enter your response rounded to four decimal places.) The…arrow_forward
- Markland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 50 checks and spends 24 minutes a day in processing and 2 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.25.a. If there are 20 kanban containers in use, what is the current daily demand of the check processing facility?b. If the muda or the waste in the system were eliminated completely, how many containers would then be needed?arrow_forwardFlores Manufacturing, Inc., is moving to kanbans to support its electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost $16 Annual holding cost subassembly $250 per subassembly 600 subassemblies Daily production Annual usage 62,500 (-50 weeks x5 days each x daily usage of 250 subassemblies) Lead time Safety stock The kanban size is (round your response to the nearest whole number). 2 days 1 day's production of subassembliesarrow_forwardThe demand for screens for a computer manufacturer is 10,000 per week. The lead time is 5 days, and this manufacturer wants to hold 2 days of safety stock. If the container size of computers is 200, what is the Kanban number? If the lead time improves to 4 days, what is the Kanban number? If the lead time moves out to 6 days and the manufacturer wants 3 days of safety stock, what is the Kanban number?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.