Interpretation: The number of kanban cards to be used for production is to be determined.
Concept Introduction:
Kanban is referred to as a
Want to see the full answer?
Check out a sample textbook solutionChapter 12 Solutions
Practical Operations Management
- Flores Manufacturing, Inc., is moving to kanbans to support its electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost $16 Annual holding cost subassembly $250 per subassembly 600 subassemblies Daily production Annual usage 62,500 (-50 weeks x5 days each x daily usage of 250 subassemblies) Lead time Safety stock The kanban size is (round your response to the nearest whole number). 2 days 1 day's production of subassembliesarrow_forwardPlease do not give solution in image formate thanku. Markland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 50 checks and spends 48 minutes a day in processing and 4 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.20. a. If there are 43 kanban containers in use, the current daily demand of the check processing facility is ______units.arrow_forwardThe production schedule at Mazda calls for 1,250 Mazdas to be produced during each of 22 production days in January and 1,050 Mazdas to be produced during each of 20 production days in February. Mazda uses a kanban system to communicate with Gesundheit, a nearby supplier of tires. Mazda purchases four tires per vehicle from the Gesundheit. The safety stock policy variable, a, is 0.08. The container (a delivery truck) size is 250 tires. The average waiting time plus material handling time is 0.50 day per container. Assembly lines are rebalanced at the beginning of each month. The average processing per container in January is 0.50 day. February processing time will average 0.10 day per container. How many containers should be authorized for January? containers. (Enter your response rounded up to the next whole number.)arrow_forward
- Krupp Refrigeration, Inc., is trying to reduce inventory and wants you to install a kanban system for compressors on one of itsassembly lines. Determine the size of the kanban and the number of kanbans (containers) needed.Setup cost = $10Annual holding cost per compressor = $100Daily production = 200 compressorsAnnual usage = 25,000 (50 weeks * 5 days each * daily usage of 100 compressors)Lead time = 3 daysSafety stock = 1 2 day’s production of compressorsarrow_forwardFlores Manufacturing, Inc., is moving to kanbans to support its electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost subassembly Daily production Annual usage Lead time Safety stock $23 $200 per subassembly 550 subassemblies 50,000 (= 50 weeks x 5 days each x daily usage of 200 subassemblies) 3 days 1 day's production of subassemblies The kanban size is (round your response to the nearest whole number). The number of kanbans is (round your response to the nearest whole number).arrow_forwardWhich TPS term decribes waste? Muda Andon Jidoka Kaizenarrow_forward
- In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 10% of the demand during lead time, the container size is 15. If the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed? Numeric Response 30arrow_forwardMarkland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 50 checks and spends 24 minutes a day in processing and 2 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.25.a. If there are 20 kanban containers in use, what is the current daily demand of the check processing facility?b. If the muda or the waste in the system were eliminated completely, how many containers would then be needed?arrow_forwardMarkland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 25 checks and spends 24 minutes a day in processing and 2 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.20. a. If there are 29 kanban containers in use, the current daily demand of the check processing facility is units. (Enter your response rounded to the nearest whole number.)arrow_forward
- Markland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 25 checks and spends 24 minutes a day in processing and 2 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.20. a. If there are 29 kanban containers in use, the current daily demand of the check processing facility is 6,000 units. (Enter your response rounded to the nearest whole number.) b. If the muda or the waste in the system were eliminated completely, whole number.) containers would then be needed. (Enter your response rounded up to the nextarrow_forwardHartley Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Janet Hartley, to reduce inventory by introducing a kanban system. After several hours of analysis, you develop the following data for scanner connectors used in one work cell. How many kanbans do you need for this connector? Daily demand Lead time Safety stock 1,600 connectors 3 days 0.50 day Kanban size 500 connectors Number of kanbans = kanbans (round your response to the nearest whole number).arrow_forwardA fabrication cell at Spradley's Sprockets uses the pull method to supply gears to an assembly line. George Jitson is in charge of the assembly line, which requires 394 gears per day. Containers typically wait 0.5 day in the fabrication cell. Each container holds 45 gears, and one container requires 0.9 day in machine time. Setup times are negligible. If the policy variable for unforeseen contingencies is set at 0.03, how many containers should Jitson authorize for the gear replenishment system? Jitson should authorize containers. (Enter your response rounded up to the next whole number.)arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.