Question
Chapter 12, Problem 2.2Q
Summary Introduction
To find:The number of models that will be produced each week if the manager changes the production to a lean mixed-model assembly schedule.
Introduction:Companies can produce different models of a product at a time. In this type of production, companies need to set batches for doing production in an economical way. The method in which schedules are prepared for the production of mixed models is known as mixed-model
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Kimberley-Clark Corporation, nike and caterpillar Inc how does these comapanies utilize lean applications?
What is meant by lean production ?
Why would a lean production manufacturer schedule 7 hours of work in an 8-hour shift?
Chapter 12 Solutions
Practical Operations Management
Ch. 12 - Prob. 1DQCh. 12 - Prob. 2DQCh. 12 - Prob. 3DQCh. 12 - Prob. 4DQCh. 12 - Prob. 5DQCh. 12 - Prob. 6DQCh. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - Prob. 3PCh. 12 - Prob. 4P
Ch. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Prob. 10PCh. 12 - Prob. 11PCh. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - Prob. 23PCh. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26PCh. 12 - Prob. 27PCh. 12 - Prob. 1.1QCh. 12 - Prob. 1.2QCh. 12 - Prob. 1.3QCh. 12 - Prob. 1.4QCh. 12 - Prob. 2.1QCh. 12 - Prob. 2.2QCh. 12 - Prob. 2.3QCh. 12 - Prob. 3.1QCh. 12 - Prob. 3.2QCh. 12 - Prob. 3.3Q
Knowledge Booster
Similar questions
- Explain the major steps and all that might be needed to accomplish in each step of lean implementation.arrow_forwardIE Carol Cagle has a repetitive manufacturing plant producing trailer hitchos in Arlington, Texas. The plant has an average inventory tumover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip $25 per hour $13 per unit Setup labor cost Annual holding cost Daily production Annual demand Desired lot size 992 units/8 hour day 33.000 (275 days each daily demand of 120 units) 124 units (one hour of production) To obtain the desired lot size, the set-up time that should be achievedminutes pound your response to two decimal places)arrow_forwardWhat is the concept of Lean?arrow_forward
- Describe what is Implementation of lean?arrow_forwardWhat Is The Basic Elements of Lean Production?arrow_forwardThe welding department supplies parts to the final assembly line. Management decides to implement a kanban system and has collected the following data. • The daily demand is 1,500 units. The production lead time is 5 days (this includes processing time, transport time, and waiting time). Management has decided to have 1 day(s) of safety stock One container fits 425 units How many kanban containers will be needed to support this system? (Round up to next whole number). containersarrow_forward
- Does Lean production work in the service sector? Provide anexample.arrow_forwardYou are asked to analyze the kanban system of LeWin, aFrench manufacturer of gaming devices. One of the worksta-tions feeding the assembly line produces part M670N. Thedaily demand for M670N is 1,800 units. The average process-ing time per unit is 0.003 day. LeWin’s records show thatthe average container spends 1.05 days waiting at the feederworkstation. The container for M670N can hold 300 units.Twelve containers are authorized for the part. Recall that r isthe average processing time per container, not per individualpart.a. Find the value of the policy variable, a, that expresses theamount of implied safety stock in this system.b. Use the implied value of a from part (a) to determinethe required reduction in waiting time if one containerwas removed. Assume that all other parameters remainconstant.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.